obstacle avoidance Arduino robot, Electrical Engineering

Assignment Help:
we work as a group on Automoted guided vehicles project, with 2 vehicles one is leading and the other is guided and following the first one, i was assigned to write an obstacle avoidance code for both of the vehicles as an extra feature.
components should be used:
Parallax PING Ultrasonic Distance Sensor 28015.
Arduino Mega 2560 ADK

i need to get answered by a full algorethem and code including some explenation to make things clear. I hope i can recieve an answer with in 18 hours please, Thanks and regards

Related Discussions:- obstacle avoidance Arduino robot

Show the dot convention, Q. For the coupled coils shown in Figure, a dot ha...

Q. For the coupled coils shown in Figure, a dot has been arbitrarily assigned to a terminal as indicated. Following the dot convention presented in the text, place the other dot in

Rectification, diagram for full wave bridge circuit single phase,full wave ...

diagram for full wave bridge circuit single phase,full wave centre tap circuit and haif wave rectification circuit

Cpi compare immediate instruction , CPI Compare Immediate Instruction ...

CPI Compare Immediate Instruction The 8 bit  data  specified  in the  instruction is  compared with the  contents of the accumulator. The comparison  is done by  subtracting

Equalizer rings, purpose of equalizer rings in lap winding

purpose of equalizer rings in lap winding

Obtain rated fundamental voltage across the motor, A 440-V, 60-Hz, six-pole...

A 440-V, 60-Hz, six-pole, wye-connected, squirrel-cage induction motor with a full-load speed of 1170 r/min has the following parameters per phase referred to the stator: R 1 = 0.

Describe 74ls139 memory decoder, Describe 74LS139 memory decoder. The 7...

Describe 74LS139 memory decoder. The 74LS139 is a dual 2-to-4 line decoder. This contains two separate 2-to-4 line decoders - all with its address, output and enable connection

Measures for improving joints and connection, Measures for Improving Joints...

Measures for Improving Joints and Connection 1. Spacing of poles: The spacing between poles (for overhead lines) is also an important requirement. Long spans will result in

Crm framework, CRM Framework There exist several ways to view CRM fram...

CRM Framework There exist several ways to view CRM framework. Therefore, an operational strategic framework is more relevant to apply CRM in power/electricity business systems

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd