Module assembly site preparation, Mechanical Engineering

Assignment Help:

Q. Module Assembly Site Preparation?

To set a module on the piles installed on project site, the following preparations shall be made:

The Designer shall provide design elevations and positions (x, y, z coordinates) for all piping tie-in points on the design drawings. It is essential that all site piping inter-module tie-ins can be worked without field modifications.

The Surveyor shall "As-Build" all piping tie-in locations at the module fabrication site. Tie-in x, y, z coordinates shall be "As-Build" referenced to the module supports.

The four corner support columns of the particular module shall be scribed and punch marked with the exact column centreline in each direction. Punch marking and scribing shall be on the:

• Vertical face of the column

• Top of the base plate

• Vertical edge of the base plate

Each support column shall be surveyed to determine its location from the key corner column (A-1) and piping tie-in locations.

The base plate of each support column shall be surveyed to determine the bottom elevation of each corner of the base plate relative to the floor and piping tie-in locations.

Prepare "As-build" drawings of the piping tie-ins and module support elevations and x, y, z coordinates.

Survey data shall be forwarded to the Owner's Site construction support and Home Office, prior to module setting on piles.


Related Discussions:- Module assembly site preparation

Stresses and strains in bars of varying sections, a concrete column of 350m...

a concrete column of 350mm diameter is reinforced with 4 bars of 25mm diameter . find the stress when the concrete is subjected to a stress of 4.5 MPa . also find the safe load in

Determine a static feedforward controller, By operation of the distillation...

By operation of the distillation columns you are often interested to maintain output despite fluctuations in the composition, ex. feed composition and feed flow. One possible actua

Explain about the deep foundation, Explain about the Deep foundation D...

Explain about the Deep foundation Deep foundations are those where the depth D is much larger than B. Piles, wells, piers and caissons belong to this group.

Calculate the depth of water, (Buoyancy of a submerged body; compressibilit...

(Buoyancy of a submerged body; compressibility of air) A grade 4 science student inverts a cup full of air into a water tank. If it takes 1 lb of force to hold the cup down 3

Characteristics of the secondary circuit, Characteristics of the secondary ...

Characteristics of the secondary circuit The dimensions of the secondary circuit in secondary loop determine to a large extent, the performance of these machines. The secondary

Describe cool storage and coal preparation technique, Illustrate in brief t...

Illustrate in brief the types of power plant? Illustrate the factor to be considered for site selection in hydro power plant? a) Compare stream power plant with hydro power p

Hydrostatic pressure, can a swimming pool that is full be cracked or lifted...

can a swimming pool that is full be cracked or lifted by hydrostatic pressure?

Determine the number of bolts required, The following specification is used...

The following specification is used for the design of a flanged coupling between two coaxial shafts: Speed: 650rpm Power transmitted: 550 kW Bolt Diameter: 12 mm Pit

Hot And Cold Working, What Are Difference Between Hot And Cold Working

What Are Difference Between Hot And Cold Working

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd