Module assembly site preparation, Mechanical Engineering

Assignment Help:

Q. Module Assembly Site Preparation?

To set a module on the piles installed on project site, the following preparations shall be made:

The Designer shall provide design elevations and positions (x, y, z coordinates) for all piping tie-in points on the design drawings. It is essential that all site piping inter-module tie-ins can be worked without field modifications.

The Surveyor shall "As-Build" all piping tie-in locations at the module fabrication site. Tie-in x, y, z coordinates shall be "As-Build" referenced to the module supports.

The four corner support columns of the particular module shall be scribed and punch marked with the exact column centreline in each direction. Punch marking and scribing shall be on the:

• Vertical face of the column

• Top of the base plate

• Vertical edge of the base plate

Each support column shall be surveyed to determine its location from the key corner column (A-1) and piping tie-in locations.

The base plate of each support column shall be surveyed to determine the bottom elevation of each corner of the base plate relative to the floor and piping tie-in locations.

Prepare "As-build" drawings of the piping tie-ins and module support elevations and x, y, z coordinates.

Survey data shall be forwarded to the Owner's Site construction support and Home Office, prior to module setting on piles.


Related Discussions:- Module assembly site preparation

Inspection of fasteners of motorcycle, Inspection of Fasteners: The motorc...

Inspection of Fasteners: The motorcycle carries number of nuts and bolts. They should be properly tightened for the smooth running of motorcycle. All fasteners are checked

Determine time required to stop the automobile, Determine time required to ...

Determine time required to stop the automobile: A 20KN automobile is moving at speed of 70Kmph when brakes are fully applied causing all the four wheels to skid. Determine ti

Determine the number of bolts required, The following specification is used...

The following specification is used for the design of a flanged coupling between two coaxial shafts: Speed: 650rpm Power transmitted: 550 kW Bolt Diameter: 12 mm Pit

Heat treatment of stainless steels, Heat Treatment of Stainless Steels: ...

Heat Treatment of Stainless Steels: Stainless steels, as other steels, react to heat treatments over broad range. They are subjected to one or more of the given heat treatmen

Power sources for arc welding, POWER SOURCES FOR ARC WELDING Electric ...

POWER SOURCES FOR ARC WELDING Electric arc welding processes constitute a majority of all the welding processes. Most of the weldable materials can be joined by arc welding. D

What is floating foundation, What is floating foundation? Floating Foun...

What is floating foundation? Floating Foundation: Raft or mat is also recommended when the soil mass contains compressible layers or the soil stratum is variable. In such ca

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd