Q. Module Assembly Site Preparation?

To set a module on the piles installed on project site, the following preparations shall be made:

The Designer shall provide design elevations and positions (x, y, z coordinates) for all piping tie-in points on the design drawings. It is essential that all site piping inter-module tie-ins can be worked without field modifications.

The Surveyor shall "As-Build" all piping tie-in locations at the module fabrication site. Tie-in x, y, z coordinates shall be "As-Build" referenced to the module supports.

The four corner support columns of the particular module shall be scribed and punch marked with the exact column centreline in each direction. Punch marking and scribing shall be on the:

• Vertical face of the column

• Top of the base plate

• Vertical edge of the base plate

Each support column shall be surveyed to determine its location from the key corner column (A-1) and piping tie-in locations.

The base plate of each support column shall be surveyed to determine the bottom elevation of each corner of the base plate relative to the floor and piping tie-in locations.

Prepare "As-build" drawings of the piping tie-ins and module support elevations and x, y, z coordinates.

Survey data shall be forwarded to the Owner's Site construction support and Home Office, prior to module setting on piles.


Related Discussions:- Module assembly site preparation

Motion of two bodies - rough surface and smooth pulley, Motion of two bodie...

Motion of two bodies - rough surface and smooth pulley: THE HORIZONTAL SURFACE IS ROUGH AND THE STRING IS PASSING OVER SMOOTH PULLEY. Figure shows two weights W 1 and W 2

Welding procedure specification (wps)-variables, Variables used in WPS ...

Variables used in WPS Depending on their influence on obtaining a desired weldment, the welding variables are then classified and listed. Some of them are listed as "Essential

Calculation of material removal rate, Calculation of Material Removal Rate ...

Calculation of Material Removal Rate MRR = (W i - W f ) × 1000/ 7.8 × T .......................................... (1) W i = Initial weight of work piece W f = Final w

Wilson hartnell governor, how to design and fabricate wilson hartnell gover...

how to design and fabricate wilson hartnell governor?

Calculate the greatest stress - plate, Calculate the greatest stress - plat...

Calculate the greatest stress - plate: A rectangular plate 10 mm thick within a hole of 50 mm diameter drilled on this is as shown in Figure 10. This is subjected to axial pul

Find out the mechanical advantage of the machines, Find out the mechanical ...

Find out the mechanical advantage of the machines: A lifting machine may lift 800 N by the application of 100 N. Distance moved by the effort is 100 cm. At the same time load

Kinematics-dynamics-kinematic link, Kinematics: This is that branch of Th...

Kinematics: This is that branch of Theory of Machines that deals with the relative motion among the several machine parts; without referring forces or torques that cause motion.

What is hot extrusion, Q. What is Hot extrusion? Hot extrusion is a hot...

Q. What is Hot extrusion? Hot extrusion is a hot working process, which means it is done above the material's recrystallization temperature to keep the material from work harde

Bearing materials, Bearing Materials Generally it can be said as a good...

Bearing Materials Generally it can be said as a good bearing material must posse following characteristics as: It must be strong enough to sustain bearing load. It

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd