Q. Module Assembly Site Preparation?

To set a module on the piles installed on project site, the following preparations shall be made:

The Designer shall provide design elevations and positions (x, y, z coordinates) for all piping tie-in points on the design drawings. It is essential that all site piping inter-module tie-ins can be worked without field modifications.

The Surveyor shall "As-Build" all piping tie-in locations at the module fabrication site. Tie-in x, y, z coordinates shall be "As-Build" referenced to the module supports.

The four corner support columns of the particular module shall be scribed and punch marked with the exact column centreline in each direction. Punch marking and scribing shall be on the:

• Vertical face of the column

• Top of the base plate

• Vertical edge of the base plate

Each support column shall be surveyed to determine its location from the key corner column (A-1) and piping tie-in locations.

The base plate of each support column shall be surveyed to determine the bottom elevation of each corner of the base plate relative to the floor and piping tie-in locations.

Prepare "As-build" drawings of the piping tie-ins and module support elevations and x, y, z coordinates.

Survey data shall be forwarded to the Owner's Site construction support and Home Office, prior to module setting on piles.


Related Discussions:- Module assembly site preparation

Mass flow rate - thermodynamics, Mas s Flow Rate (m ): In absence of ...

Mas s Flow Rate (m ): In absence of any mass getting stored system we can write; Mass flow rate at inlet = Mass flow rate at outlet That is, m f1  = m f2 as m f  = d

Explain working of belt transmission type dynamometer, Explain construction...

Explain construction and working of Belt transmission type Dynamometer?

the log and the ramp, A 228 kg log is pulled up a ramp by means of a rope ...

A 228 kg log is pulled up a ramp by means of a rope that is parallel to the surface of the ramp. The ramp is inclined at 30.0° with respect to the horizontal. The coefficient of ki

CENTRE OF GRAVITY OF WIRE, WHATIS CG OF A WIRE BENT IN THE FORM OF A QUARTE...

WHATIS CG OF A WIRE BENT IN THE FORM OF A QUARTER ELLIPSE

Calculate the suitable diameter for a solid shaft, A shaft is hinghed by tw...

A shaft is hinghed by two bearings placed 1.0 m apart. A 600mm diameter pulley is mounted at a distance of 300 mm to the right of left hand bearing and this operates a pulley direc

What are the limitations with rectangular combined footings, What are the l...

What are the limitations with rectangular combined footings? In this section the analysis is limited to the determination of plan dimensions of the footing. The physical dimens

Determine the actual absolute velocity, Question: As shown in the figur...

Question: As shown in the figure, the jet transport B is flying north with a velocity V B = 600 Km/h when a smaller aircraft A passes underneath the transport headed in the 60

Determine the steady state amplitude of vibration, 1. (a) Sketch frequency-...

1. (a) Sketch frequency-response curves for a damped single degree of freedom system subjected to a harmonic excitation under three different damping ratios. The system has a natur

Advantages of laser welding process, Advantages of Laser Welding Process ...

Advantages of Laser Welding Process   1) Narrow deep penetration welds capable of being produced in atmosphere. 2) Low thermal distortion - due to less heat input and paral

EM2013KEN2401MECH, Hi. I have made a payment for the above ticket number. W...

Hi. I have made a payment for the above ticket number. Will I get all the workings out too? [email protected]

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd