Module assembly site preparation, Mechanical Engineering

Assignment Help:

Q. Module Assembly Site Preparation?

To set a module on the piles installed on project site, the following preparations shall be made:

The Designer shall provide design elevations and positions (x, y, z coordinates) for all piping tie-in points on the design drawings. It is essential that all site piping inter-module tie-ins can be worked without field modifications.

The Surveyor shall "As-Build" all piping tie-in locations at the module fabrication site. Tie-in x, y, z coordinates shall be "As-Build" referenced to the module supports.

The four corner support columns of the particular module shall be scribed and punch marked with the exact column centreline in each direction. Punch marking and scribing shall be on the:

• Vertical face of the column

• Top of the base plate

• Vertical edge of the base plate

Each support column shall be surveyed to determine its location from the key corner column (A-1) and piping tie-in locations.

The base plate of each support column shall be surveyed to determine the bottom elevation of each corner of the base plate relative to the floor and piping tie-in locations.

Prepare "As-build" drawings of the piping tie-ins and module support elevations and x, y, z coordinates.

Survey data shall be forwarded to the Owner's Site construction support and Home Office, prior to module setting on piles.


Related Discussions:- Module assembly site preparation

Gears, what is gear kinematics

what is gear kinematics

Adhesives, Adhesives Adhesives are a substance able of holding materia...

Adhesives Adhesives are a substance able of holding materials together. A joint is formed among two solids is called adherends with a thin layer of adhesive among them. Mainly

Show produced water de-oiling unit, Q. Explain about water De-Oiling proces...

Q. Explain about water De-Oiling process? The De-Oiling process consists of three major components: The Surge and Skim Tank which reduces PW oil content to 100 ppm I

Evaluate mechanical work - thermodynamics, Evaluate mechanical work in diff...

Evaluate mechanical work in different steady flow process: Work done by steady flow process   and work done in non flow process,   1. Constant Volume Process; W 1-2 = V

Explain the side relief angle, Explain the Side Relief Angle It is angl...

Explain the Side Relief Angle It is angle made by flank of a tool and plane perpendicular to base just under the side cutting edge. if the side relief angle is very large the c

Laminar flow, Consider fully developed laminar flow with constant propertie...

Consider fully developed laminar flow with constant properties in a circular tube. Let there be heat transfered  to or from  the fluid at a constant rate per unit of tube length.Ad

What is a positive displacement pump, A positive displacement pump is a liq...

A positive displacement pump is a liquid or gas to move by trapping a fixed amount of fluid or gas and then forcing (displacing) that trapped volume into the discharge pipe. Positi

Spring, what is the geometry of a leaf spring

what is the geometry of a leaf spring

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd