matlab question please help me, Mechanical Engineering

Assignment Help:
The salary calculation method for employees of a company is as follows:
(1) If the number of working hours exceeds 120 hours, an additional 15% will be issued
for the excess part;
(2) If the working hours are less than 60 hours, RMB 700 will be deducted;
(3) The rest will be paid at 84 dollar per hour;
Try programming to calculate the salary payable and display the result according to the
number of hours entered by the employee

Related Discussions:- matlab question please help me

Theorem of parallel axis, Theore m of parallel axis It states that if ...

Theore m of parallel axis It states that if the M.I. of plane area about the axis passing through the C . G . can be denoted by I G . The M . I . of area about any other

Thin uniform wire bent - centre of gravity, Thin uniform wire bent - centre...

Thin uniform wire bent - centre of gravity: Find out the C. G. of the thin uniform wire bent into shape ABC as illustrated in Figure. Solution Assume G be the loc

Illustrate the structure of set, Illustrate the structure of SET SET al...

Illustrate the structure of SET SET allows the exchange of data between different CAD/CAM systems and also between CAD/CAM systems and central data banks. It features a much mo

Analysis of trusses, State the assumptions in pin joined trusses?

State the assumptions in pin joined trusses?

Stroke -engine terminology , Stroke: The nominal distance through which a...

Stroke: The nominal distance through which a working piston moves between two successive reversals of its direction of motion is called the stroke and is designated by the letter

Static Force Analysis, Link O4C of a 4-bar mechanism is subjected to a torq...

Link O4C of a 4-bar mechanism is subjected to a torque T4=1Nm[ccw]. The link BC is subjected to a force Q=45N @900 downwards. Determine the torque T2 on link O2B and the reactions

Materials requirements planning, Materials requirements planning: Mate...

Materials requirements planning: Materials requirements planning (MRP) is a set of process for converting forecasted demand for a manufactured product into a requirement sched

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd