matlab question please help me, Mechanical Engineering

Assignment Help:
The salary calculation method for employees of a company is as follows:
(1) If the number of working hours exceeds 120 hours, an additional 15% will be issued
for the excess part;
(2) If the working hours are less than 60 hours, RMB 700 will be deducted;
(3) The rest will be paid at 84 dollar per hour;
Try programming to calculate the salary payable and display the result according to the
number of hours entered by the employee

Related Discussions:- matlab question please help me

How is bearing capacity of soil varied, How is bearing capacity of soil var...

How is bearing capacity of soil varied? The bearing capacity of soil varies not only with its strength but also with the magnitude and distribution of the load. When a load Q,

Mechanics, definition of open and cross belt drive

definition of open and cross belt drive

Separator-battery components , Separator:   Separator works as insulator b...

Separator:   Separator works as insulator between positive and negative plates. These separators are placed between each pair of plates.

Battery components , Cell Connectors A cell connector connects the ne...

Cell Connectors A cell connector connects the nearby cell with two terminals of opposite polarity (sign). Post strap connect the plates to the terminal. Electrolyte

Define flavorings in iges, Define Flavorings in IGES Flavorings : IGE...

Define Flavorings in IGES Flavorings : IGES contained several ways to capture the same information, which made proper interpretation largely dependent on the particular  "fla

Total tension in cable of the elevator, Total tension in cable of the eleva...

Total tension in cable of the elevator: An elevator having weight 5000N is ascending with an acceleration of 3m/sec 2 . During this ascent its operator which is having weig

Explain cutting speed - cutting parameters, Explain Cutting Speed - Cutting...

Explain Cutting Speed - Cutting Parameters It is relative speed (V 1 ) between wheel and the Work piece. It is expressed in m/sec.   V=Cutting speed=V 1   =

Problem type-aspects of scheduling , Problem Type Aforementioned illust...

Problem Type Aforementioned illustration relates to the class of non-cyclic scheduling problems characterized via the subsequent features. (a) The Flexible Manufacturing Sys

The linear dimension command, The Linear Dimension Command            ...

The Linear Dimension Command                                    You can use this command to generate horizontal and vertical dimensions.Creating a linear dimension is eas

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd