Mass and partial energy balance, Chemical Engineering

Assignment Help:

Mass and Partial Energy Balance

The process flow diagram attached shows a very simplified approach to the production of Potash from Sylvinite ore. Conduct a mass balance and a partial energy balance across this process using the data constraints and stream information outlined below. A molar balance is not required. Provide a concise report outlining your methodology, assumptions made and your mass balance table/spreadsheet. The report should be no more than 10 A4 pages including tabular output and handed in on Tuesday 9th October, 13:00 in ChE 124, as well as through webct.

An energy balance across the two dryers, the hot leach and the crystalliser is required. Discuss how heat integration might be applied. Brine is used to facilitate the separation of KCl from NaCl.

Brine is saturated sodium chloride solution. At ambient temperature it will dissolve neither KCl nor NaCl. At 90°C it will form a solution with the mass composition: 0.6% NaCl, 20%KCl, 79.4% brine. For the purpose of the mass balance treat the brine as a constant composition liquid. For the energy balance across the two fluidised bed dryers, treat it as H2O, comment on the validity of this assumption.

Note that the percentage separations given in the table below are nominal and may be adjusted within reason to help achieve the product specification and yields.


Related Discussions:- Mass and partial energy balance

Explain the fluidized catalytic cracking method, 1. What are chemical fuels...

1. What are chemical fuels? How they are classified?  List the characteristics of a good fuel. 2. Define cracking. Explain the fluidized catalytic cracking method with neat diag

Process control, A tank contains cold water at a temperature Tc = 20°C and ...

A tank contains cold water at a temperature Tc = 20°C and volume Vc = 1 m3. You add a volume Vh = 1 m3 of water at temperature Th = 100°C at time t = 0. Energy is lost from the tan

Smelting furnaces, complete process of reverberetoy furnace?

complete process of reverberetoy furnace?

Flashlights, why are some flashlights brighter than others?

why are some flashlights brighter than others?

Replacement of equipment, A company is using a piece of equipment which ori...

A company is using a piece of equipment which originally cost $30,000. The equipment has been in use for 5 years, and now has a net realizable value of $6000. At the time of instal

Explain drift current, Drift current is the electric current, or movement ...

Drift current is the electric current, or movement of charge carriers, which is because of the applied electric field, often stated as the electromotive force over a given distanc

Process Control, An operator tells you that it takes 2 minutes for a proces...

An operator tells you that it takes 2 minutes for a process to get half way to the final value after a step change in the input. What can you infer about the process time constant

Polymers.., what are the merits and demerits of free radical

what are the merits and demerits of free radical

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd