Mandatory checks during the first six services , Mechanical Engineering

Assignment Help:

MANDATORY CHECKS DURING THE FIRST SIX SERVICES

Various steps in servicing of motorcycle are given below in a tabular form.

2.3.1 First Service and Second Service First Service

Second Service

Sl. No.

Steps of Servicing

Sl. No.

Steps of Servicing

1.

Wash the vehicle. Blow, dry with air pressure

2.

Wash the vehicle. Blow, dry with air pressure

3.

Clean fuel strainer

4.

Clean fuel line and fuel strainer

5.

Inspect throttle operation, lubricate if necessary

6.

Inspect throttle operation, lubricate if necessary

7.

Clean air filter element

8.

Inspect carburetor, choke and adjust if necessary

9.

Inspect spark plug gap, adjust valve clearance

10.

Clean air filter element

11.

Replace engine oil

12.

Inspect, clean and adjust the spark plug gap

13.

Check battery, specific gravity and level of the electrolyte and if necessary top up with distilled water

14.

Replace engine oil, top up/replace as required

15.

Clean engine oil filter screen and rotor filter

16.

Inspect engine idle speed and adjust if necessary

17.

Adjust brakes. Inspect for shoe wear/disk pad wear

18.

Check battery, specific gravity and level of the electrolyte and if necessary top up with distilled water

19.

Check brake light switch function

20.

Inspect and lubricate brake system (brake cam and brake pedal).

Prepare a list and explain the mandatory checks to be carried out during first and second service of a motorcycle.


Related Discussions:- Mandatory checks during the first six services

Safety and loss prevention, Q. Safety and Loss Prevention? Are there sp...

Q. Safety and Loss Prevention? Are there special venting requirements for flammables and toxic materials? Air conditioning, heating and ventilation: • are non-sparking fa

Newer approaches to on-line scheduling, Newer Approaches To On-Line Schedul...

Newer Approaches To On-Line Scheduling  The on-line scheduling has established to be superior option than off-line scheduling upon the shop floor. The on-line scheduling looks

Design of the plc ladder and profibus - asi network, 1 Prepare an updated s...

1 Prepare an updated sketch of the electro-hydraulic system shown in Figure showing the actuators in their start position appropriate to your allocated actuator sequence. 2 By u

Stress concentration factor, 1. Write a short note (not more than half A4 p...

1. Write a short note (not more than half A4 page) on your understanding on St. Venant's Principal for your engineering design analysis. 2.  Estimate the " Stress Concentration

Assignment, history of electronics materials

history of electronics materials

Explain concept of counter bore in radial drilling machine, Explain concept...

Explain concept of Counter Bore and countersink in radial drilling machine Counter Bore :- This operation uses a pilot to guide the cutting action to accommodate the heads

Determine reactions at supports, Determine reactions at supports: Det...

Determine reactions at supports: Determine reactions at supports of supported beam of 6m span carrying increasing load of 1500N/m to 4500N/m from one end to another end.

Line of action of force, Line of action of force: Sol.: The directio...

Line of action of force: Sol.: The direction of force along the straight line through its point of application, in which force tends to move body to which it is applied. Thi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd