Major ways to undertake negative skin friction, Civil Engineering

Assignment Help:

Question

What are major ways to undertake negative skin friction?


Answer

(i) Utilize slender pile sections since smaller pile area when subject to same working load would manufacture higher deformation, therefore increasing relative downward movement of piles.

(ii) In a sure region of H-piles for ground water table variation, painting is applied on surface of H-piles since rise and fall of water table contribute to corrosion of H-piles. On other hand, to reduce effect of extra loads brought about by negative skin friction, bitumen is practical on pile surface corresponding to region of soils that has negative skin friction. But, bitumen should not be applied to whole section of H-piles as it would be unable to derive designed frictional reaction from soils.

(iii) Designing of piles as end-bearing so that they are able to take up more loads.

 


Related Discussions:- Major ways to undertake negative skin friction

Moment of force on shoulders, During weight training,an athlete pulls a wei...

During weight training,an athlete pulls a weight of 500 N with his arms pulling on a handlebar connected to a universal machine by a cable.Find the moment of the force about the sh

Sewer manhole, minimun difference in level of inlet and oulet pipe level in...

minimun difference in level of inlet and oulet pipe level invert in manhole

Surveying., with a neat well labelled, explain reciprocal ranging in survey...

with a neat well labelled, explain reciprocal ranging in surveying.

#title, Explain couple. What are the characteristics of a couple?

Explain couple. What are the characteristics of a couple?

Explain hot weather patrolling, Q. Explain Hot weather Patrolling ? Hot...

Q. Explain Hot weather Patrolling ? Hot weather Patrolling is done for LWR and CWR tracks when the rail temperature reaches td + 20 0 C and above and td + 14 0 C for Central

Ground water, Two pumping wells 1,000 m away fully penetrate the same confi...

Two pumping wells 1,000 m away fully penetrate the same confined aquifer. One of the wells pumps at a rate of 1,240 m3/day. The second well pumps at 850 m3/day. If the aquifer has

What is a projection line, Projection line is the way, in which the earth i...

Projection line is the way, in which the earth is made known on a flat piece of paper.

Levelling, how to establish temporary benchmark

how to establish temporary benchmark

Calculate the total duration for the four activity project, Calculate the T...

Calculate the Total Duration for the Four Activity Project Solution:      Scheduling work activity has associated time duration. The durations shown in the Table were e

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd