Installation of meters and verification of connections, Electrical Engineering

Assignment Help:

Installation of Meters and Verification of Connections

Apart from testing and calibrating the meters they must be properly installed as per the links diagram. The points in which must be kept in view although meters are installed are given below.

Installation of Meters

a) Position of meter should be such in which reading is simply visible.

b) Mounting of meter should be on solid wall or DP structure or on panel board.

c) Vertical mounting of meters should be ensured. The utility engineer should use a plumb bob and mark a vertical line prior to installation. He could also use a spirit level and put on the top of the meter after hanging on the screw hole. Instead, he should put spirit level on the edge of the terminal block to ensure vertical mounting.

d) For HT metering equipment, CTs should be right on the incoming side before the point of isolation.

e) The meter box should be sealed.

f) The meter recording should be checked at site.


Related Discussions:- Installation of meters and verification of connections

Dc chopper - power supplies , DC chopper This is  one stage  conversio...

DC chopper This is  one stage  conversion  device  which is used for direct conversion of fixed  de voltage at a level to an adjustable dc voltage  at another  level.

Illustrate simple telephone communication system, Q. Illustrate simple tele...

Q. Illustrate simple telephone communication system with circuit and equation of current flow in microphone? Ans: Simple  Telephone  Communication: In the simplest form of

RLC, a 49pf cap,a 50 uH inductor, and a 100 ohms resister are in parallel: ...

a 49pf cap,a 50 uH inductor, and a 100 ohms resister are in parallel: what is the resonance freq? And what is the complex impedance vector at 100MHZ?

Explain function of application layer, Q. Explain function of application l...

Q. Explain function of application layer? Layers of OSI model are as follows: (1) The Physical Layer: This defines an interface in terms of connections, voltage levels and

Explain the importance of distributing frames, Q. Explain the Importance of...

Q. Explain the Importance of distributing frames? Basically four levels of cabling are used as displayed in Figure. At the subscriber end, drop wires are taken to a distributio

Why biasing in necessary in transistor, (a) Describe why ordinary junction ...

(a) Describe why ordinary junction transistor is known as bipolar. (b) Describe working of NPN transistor as common Base configuration. Describe working of NPN transistor in

Monostable delay in matlab, how to implement monostable delay in matlab sim...

how to implement monostable delay in matlab simulink environment? [email protected]

Determine the disadvantages of expert systems, Determine the Disadvantages ...

Determine the Disadvantages of expert systems -  Lacks common sense in some decision making processes -  Errors in the knowledge base can result in incorrect decisions being

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd