Inspection and testing for coating application, Mechanical Engineering

Assignment Help:

Q. Inspection and testing for coating application?

The Applicator shall perform all inspection and testing necessary to assure that the surface preparation and coating application comply with the requirements of this specification. All work shall be subject to the OWNER's inspection. The OWNER shall be the final authority on the acceptability of surface preparation and coating application.

The powder manufacturer's representative shall have access to the Applicator's facilities during the progress of the work to undertake any inspection and testing deemed necessary to ensure that the coatings are properly applied.

The Applicator shall keep the records of operating parameters and inspection and test results, and submit such records to OWNER's inspector on a daily basis, for verification. This daily record keeping and submittal to the OWNER's inspector is important to ensure continuing compliance with the specification.


Related Discussions:- Inspection and testing for coating application

Helix angle, what is helix angle and how to determine it?

what is helix angle and how to determine it?

Matlab Applied Optimization Problem, A fenced enclosure consists of a recta...

A fenced enclosure consists of a rectangle of length L and width 2R, and a semicircle of radius R, as shown in Figure P20. The enclosure is to be built to have an area A of 1600 ft

Explain objectives of radial drill machine, Explain Objectives of Radial dr...

Explain Objectives of Radial drill machine There are many objectives such like, 1.   With the help of angle drill machine, an angle hole can be produced at any angle.  2.

Electron beam welding-working chamber, Working Chamber of EBW Th...

Working Chamber of EBW The chamber is usually rectangular in shape and has heavy windows to permit viewing the work. Both high voltage machines and low voltage machines

Process planning, we have to design crane we did already with calculation r...

we have to design crane we did already with calculation remaining is process planning

What are square footings, What are square footings? SQUARE FOOTINGS ...

What are square footings? SQUARE FOOTINGS This type of footing, also termed an isolated spread footing is probably the most common, simplest and most economical of the vario

Determine the eigen values, Determine the eigen values and eigen vectors of...

Determine the eigen values and eigen vectors of the matrix

Explain different types of frames, (a) Explain different types of frames. C...

(a) Explain different types of frames. Compare their merits and demerits. Diagram and illustrate a frameless construction. (b) Illustration briefly the constructional features o

Structural design, The Contractor is responsible for obtaining all drawings...

The Contractor is responsible for obtaining all drawings, standards and specifications referred to in the bid documents and to request as needed additional or missing reference dat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd