Improvements required - industrial safety, Mechanical Engineering

Assignment Help:

Improvements Required - Industrial Safety

The outlining of association of safety engineering, as done above, with quality, productivity, profit etc. has also tended to make impediments in successful implementation of safety programmes. The safety professionals tend to become overzealous and frequently are inclined to neglect cost benefit ratio and payback of their practices. It has also been observed that many workers display resistance to adopt new safety measures while confronted first time. A successful safety drive frequently comes after a number of false starts. Successful safety programmes are management initiated but workers dependent. It is always significant to take cognizance of workers' comprehension of safety and any specific safety programme.

In a survey a large cross-section of workers was consulted and it was found that employees of large organizations are more safety conscious than those of small organizations. The common feeling among workers was that safety was the responsibility of management. They as well thought government must make rules for safety and intervene more frequently in this regard. They thought sound safety programmes, training and drills were essential for safety of workers in work place. A small proportion of workers only thought that they were adequately trained and showed dependence on coworkers for safety thinking that they knew better. It was noted in the survey that the employees who did not receive safety training were liable to experience two times as many on-the-job accidents as those who had received safety training. The workers who had met accidents were not prepared to accept their responsibility towards accident where as almost 85% of them agreed that accidents could have been avoided. The general consensus between the workers was that safety programmes and training should be organized, frequent inspection and enforcement of safety rules be followed, better and more safety equipment be provided and their maintenance be made sure.


Related Discussions:- Improvements required - industrial safety

Corrosion assessment for mvc evaporator system, Q. Corrosion Assessment for...

Q. Corrosion Assessment for MVC Evaporator System? Typical evaporator systems in SAGD plants operate under extremely severe corrosive conditions due to high chloride content, e

Maths, Physical meaning of gradient of 2 nd order tensor?

Physical meaning of gradient of 2 nd order tensor?

Assumptions made in deriving torsional formulas, Assumptions made in derivi...

Assumptions made in deriving torsional formulas: What are assumptions made in deriving torsional formulas?                                           Sol.: The torsion

Explain about the eccentrically loaded footings, Explain about the eccentri...

Explain about the eccentrically loaded footings. ECCENTRICALLY LOADED FOOTINGS When footings have overturning moments and axial loads, the base pressure under the footing wi

Calculate the vertices for a translated triangle, A triangle PQR with verti...

A triangle PQR with vertices P(2,1), Q(4,4) , R(1,3) is to be translated by 2 units in x - direction and 4 units in y direction. Using the homogenous coordinate system, calculate t

Engine, maximum rpm at engine

maximum rpm at engine

Fuse-fundamentals of electricity , Fuse :  Fuse wire is made of soft ...

Fuse :  Fuse wire is made of soft metal and housed in a glass tube. It is connected in circuit. It protects the electrical accessories, which may be damaged by the overflow o

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd