Improvements Required - Industrial Safety

The outlining of association of safety engineering, as done above, with quality, productivity, profit etc. has also tended to make impediments in successful implementation of safety programmes. The safety professionals tend to become overzealous and frequently are inclined to neglect cost benefit ratio and payback of their practices. It has also been observed that many workers display resistance to adopt new safety measures while confronted first time. A successful safety drive frequently comes after a number of false starts. Successful safety programmes are management initiated but workers dependent. It is always significant to take cognizance of workers' comprehension of safety and any specific safety programme.

In a survey a large cross-section of workers was consulted and it was found that employees of large organizations are more safety conscious than those of small organizations. The common feeling among workers was that safety was the responsibility of management. They as well thought government must make rules for safety and intervene more frequently in this regard. They thought sound safety programmes, training and drills were essential for safety of workers in work place. A small proportion of workers only thought that they were adequately trained and showed dependence on coworkers for safety thinking that they knew better. It was noted in the survey that the employees who did not receive safety training were liable to experience two times as many on-the-job accidents as those who had received safety training. The workers who had met accidents were not prepared to accept their responsibility towards accident where as almost 85% of them agreed that accidents could have been avoided. The general consensus between the workers was that safety programmes and training should be organized, frequent inspection and enforcement of safety rules be followed, better and more safety equipment be provided and their maintenance be made sure.


Related Discussions:- Improvements required - industrial safety

Determine initial tension in the belt, A flat belt, 8 mm thick and 100 mm w...

A flat belt, 8 mm thick and 100 mm wide transmits power between two pulleys, running at 1600 m/min. The mass of the belt is 0.9 kg/m length. The angle of lap in the smaller pulle

Determine the tension in the cord, Determine the tension in the cord: ...

Determine the tension in the cord: Two blocks containing the weights and positions illustrated in Figure rest on a frame which rotates around its vertical axis at a constant s

Bending equation, State and define the bending equation and mention it''s u...

State and define the bending equation and mention it''s units and derive it

Newton''s ring, Explain construction and working process of newton''s ring

Explain construction and working process of newton''s ring

Why is stress relieving in post-weld treatment necesaary, In case of welded...

In case of welded vessels why is stress relieving in the form of post-weld treatment necessary? When a metal is welded together the point at which two surfaces are joined are s

What are the specific issues with plant layout, Q. What are the Specific Is...

Q. What are the Specific Issues with plant Layout? There are a large number of regulations and related material that impact the operating plant. API (American Petroleum Institu

Overhead bridge crane, Overhead Bridge Crane Figure below shows a jib cr...

Overhead Bridge Crane Figure below shows a jib crane. In this type of crane the hook can move in a circular path. A jib crane is preferred where lifting of the jobs is requ

Main factors to be considered when selecting material, Main Factors to be C...

Main Factors to be Considered when Selecting Material The main factors to be considered when selecting a material to meet some specific requirement are: Fitness of use,

What do you mean by risers and downcomers, Q. What do you mean by Risers an...

Q. What do you mean by Risers and Downcomers? Risers and downcomers shall be staggered along the shell of the WHB and steam drum for uniform water/steam circulation in the syst

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd