Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Illustrates about the power dissipation management in embedded system?
Power Dissipation Management
a. Clever real-time programming through Wait and Stop instructions
b. Clever reduction of the clock rate throughout exact set of instructions
c. Optimizing the codes and
d. Clever disabling and enabling of utilize of caches or cache blocks.
Q. Find the output voltage in terms of the input voltage? In order to illustrate the insensitivity of feedback circuits to variations of the op-amp parameters, let us consider
1. Produce a fully-labelled sketch to show the components of a Direct Digital Control system. 2. State the minimum number of printed-circuit cards required to construct a basic co
Q. What is the basic principle of oscillation in an RC phase shift oscillator. With a neat sketch explain its working? For producing oscillations there must have positive feedb
D flipflop
Q. The inductance per unit length in H/m for parallel-plate infinitely long conductors in air is given by L = µ 0 d/w = 4π×10 -7 d/w, where d and w are inmeters. Compute L (per un
Q. A transformer is rated 10 kVA, 220:110 V (rms). Consider it an ideal transformer. (a) Compute the turns ratio and the winding current ratings. (b) If a 2-load resistance
Design a suitable double –layer lap winding for a 6-pole dc armature with 18 slots and two coil sides per slot. Give values of front-pitch, brack–pitch and commutator pitch. Draw t
Q. Write a short note on the working of Darlington Amplifier? A Darlington Amplifier is one that is employing the Darlington pair of transistors. It is a
Faraday conducted a series of experiments on coils in a magnetic field. He found that if the magnetic flux density threading a coil were changed, a voltage was induced in the co
Methods of Testing Irrespective of reasons, testing is commonly carried out 1. On site, or 2. In a Meter Testing Station (MTS) accredited as per IS/ISO/IEC 17025.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd