Illustrate exploratory testing.
- In exploratory testing approach testers are involved in maximum test execution and minimum planning.
- Planning includes creation of a test charter, a short declaration of the scope of a short time-boxed test effort, objectives and possible approaches to be used.
- The test execution and test design are performed parallely without any formal documentation of test cases, test conditions or test scripts. Though, this doesn't imply that other more formal testing techniques won't be used.
Problem: (a) Draw an Entity Relationship Diagram for the given case study. Show entities and relationships on the diagram (attributes should not be shown). Cardinality and op
Marketing and Sales (M/S) is the focal point of many of Hawkins Cookers Ltd, because they are responsible for selling the company's product (a) Consider you are the Chief Inform
How can you create a file named -i? Which techniques do not work, and why do they not work? How can you remove the file named -i?
Q. Explain Steps in Building the Structure Chart? Steps in Building the Structure Chart 1. Identify top level modules as well as decompose them into lower levels 2. Add
What are the challenges in software? Copying with legacy systems. Heterogeneity challenge Delivery times challenge
Determine the various levels of testing The following are various levels of testing: Large systems are built out of subsystems which are made up of modules, modules of funct
Problem 1 Explain change control? Write down the steps followed for change control Problem 2 Explain the concept of Baselines with reference to software configuration m
What are the umbrella activities of a software process? Software project tracking and control. Risk management. Software Quality Assurance. Formal Technical Reviews.
Question: a) List and explain three project Estimation techniques. b) During an estimation exercise, a work breakdown structure (WBS) is used as checklist for the activitie
Q. Define graph matrix and connection matrix. Ans: Graph matrix: A graph matrix is a square matrix whose size that is a number of rows and columns is equal to the number of n
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd