graphical design notation, Software Engineering

Assignment Help:
box diagram with example

Related Discussions:- graphical design notation

Describe the prototyping methods in software process, Describe the prototyp...

Describe the prototyping methods in software process. Two methods i. Evolutionary prototyping - In this approach of system development, the early prototype is prepared and i

What is cm plan, What is CM plan? Explain the types of documents to be ...

What is CM plan? Explain the types of documents to be managed and a document naming scheme. Explain who takes responsibility for the CM procedures and creation of baselines.

Explain data accuracy, Data accuracy Don't collect redundant data  T...

Data accuracy Don't collect redundant data  The questions to be answered should be decided in advance and the needed data identified. Tell people why the data is being co

Explain structural testing, Testing that takes into account the internal me...

Testing that takes into account the internal mechanism [structure] of a system or component. Types contain branch testing, path testing, statement testing. Testing to insure eve

Determine the level 4 of key process areas, Determine the Level 4 of key pr...

Determine the Level 4 of key process areas Level 4 KPAs: 1)      Quantitative Process Management (QP): It states quantitative standards for software process. 2)

State the coding standards, State the Coding standards Coding standar...

State the Coding standards Coding standards normally give the guidelines about following: i)  Name of the module ii)  External and Internal documentation of source code

Name the functionality which wasn''t listed in requirements, What do you do...

What do you do if you have provided functionality which wasn't listed in requirements? - If functionality isn't necessary to purpose of the application, it must be removed.

Explain integration testing, 1. An orderly development of testing in which ...

1. An orderly development of testing in which software elements, hardware elements, or both are joined and tested, to check out their interactions, unless the entire system has bee

Nonfunctional requirements of clue-less system, Nonfunctional Requirements ...

Nonfunctional Requirements Performance Requirements PE-1: The Clue-Less system shall accommodate 6 users during peak usage, with an estimated average session duration of 15 m

Construct an e-r diagram, Construct an E-R Diagram for the application desc...

Construct an E-R Diagram for the application described on the next page. Include any additional assumptions you made about the application requirements. The assumptions may not dir

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd