High strength friction grip bolts and normal bolts, Civil Engineering

Assignment Help:

High strength friction grip (HSFG) bolts vs. normal bolts

HSFG bolts have the following benefits when compared with normal bolts:

(i)  Performance of preloaded HSFG bolts under fatigue loading is good since the pre-stressed bolts are subjected to decreased stress range during every loading cycle when compared with unloaded bolts.

(ii) For structures adjacent to machinery that produce substantial vibration, preloading bolts can help to avoid the loosening of bolts.

(iii)HSFG bolts are used in connections where any slight slip movement would reduce the integrity of whole structures break down.

(iv)  Because of its high tensile strength, it's commonly used in connections that require the taking up of high flexure and tensile stress produced could be readily resisted by it high tensile strength.


Related Discussions:- High strength friction grip bolts and normal bolts

Physics, interplanar spacing

interplanar spacing

How to calculate the total loss of prestress, How to calculate the total lo...

How to calculate the total loss of prestress As a general guide, it may be taken that total loss of prestress may be in the range of 20 to 25 percent of the initial prestress,

Normal stress, how does wrong calculations in normal stress cause partial o...

how does wrong calculations in normal stress cause partial or total collapse of a building?

GRILLAGE FOUNDATION, WHY ONLY I-SECTIONS ARE USED IN CONSTRUCTING GRILLAGE ...

WHY ONLY I-SECTIONS ARE USED IN CONSTRUCTING GRILLAGE FOUNDATION

Surveying, What is the shrinkage factor

What is the shrinkage factor

Infrastructure railway design, The objective of this module is:- - For t...

The objective of this module is:- - For the student to identify the track design issues and there relationships that will need to be considered in the development of a feasibili

Physical tests on cement, Physical Tests on Cement (a) Soundness Test: ...

Physical Tests on Cement (a) Soundness Test: by sieve analysis, it is conducted. 100 gms of cement is taken and sieved throughout IS sieve No. 9 for fifteen minutes. Residue on

Cutbacks and emulsions, Cutbacks And Emulsions: Cutbacks A cu...

Cutbacks And Emulsions: Cutbacks A cutback is a bitumen whose viscosity has been reduced by adding a diluent such as naphtha or kerosene. The use of cut-back is not f

Basic, what you mean by civil engineering

what you mean by civil engineering

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd