High and narrow beams, Civil Engineering

Assignment Help:

Question

Give a reason that why are high and narrow beams not desirable in concrete piers?


Answer

Supported on past experience in other, high and narrow beams after numerous years of construction showed signs of severe deterioration at bottom of beams. Though, deterioration of pier slabs was not important at what time compared with that of deep beams. Main reason to account for this is due to close proximity of deep beams to the sea level. To pass up these problems, either beamless slab or wide with shallow beams are usually designed.

 


Related Discussions:- High and narrow beams

Application of bitumen to driven piles, Q. Application of bitumen to driven...

Q. Application of bitumen to driven piles? In a certain area of H-piles subjected to ground water table fluctuation, painting is occasionally applied on the surface of H-piles

Define fixed instrumentation - sounding or sensing devices, Define Fixed in...

Define Fixed instrumentation - Sounding or Sensing Devices? It is possible to monitor local scour at pier or abutment using fixed instrumentation as an alternative to the sound

Softening point test, Softening Point Test: The temperature at which ...

Softening Point Test: The temperature at which bitumen softens is determined by the "Ring and Ball" test (Figure). (a) Diagram of Apparatus at Beginning of Test  (b

Tests on bricks, Tests on Bricks The following laboratory tests can be...

Tests on Bricks The following laboratory tests can be conducted on the bricks to find their suitability: 1.    Crushing strength 2.    Absorption 3.    Shape and size

#titlemichelson interferometer.., Describ the construction and working of M...

Describ the construction and working of Michelson interferometer and discuss tha method to determine wavelength of monochromatic

Define the categories of corrosion of steel structures, Define the Categori...

Define the Categories of Corrosion of steel structures? Corrosion of steel structures can be classified as under: -   Atmospheric corrosion -   Underwater corrosion -

Guiding considerations in planning, Guiding Considerations in Planning: ...

Guiding Considerations in Planning: The following factors have a bearing on planning water transport facilities : (a)        Availability adequate land to accommodate the

Plants aeration period, Plants aeration period: Problem: What i...

Plants aeration period: Problem: What is the plant's aeration period? Solution The plant's aeration period is the number of hours that the wastewater is aerated

Hydrographic data for design of bridge, Q.What Hydrographic data required f...

Q.What Hydrographic data required for Design of bridge? (i) Design discharge for bridge waterway and foundation with corresponding high flood levels. Frequency curve for annual

P.h.e, procedure for designing of sewage scheme

procedure for designing of sewage scheme

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd