High and narrow beams, Civil Engineering

Assignment Help:

Question

Give a reason that why are high and narrow beams not desirable in concrete piers?


Answer

Supported on past experience in other, high and narrow beams after numerous years of construction showed signs of severe deterioration at bottom of beams. Though, deterioration of pier slabs was not important at what time compared with that of deep beams. Main reason to account for this is due to close proximity of deep beams to the sea level. To pass up these problems, either beamless slab or wide with shallow beams are usually designed.

 


Related Discussions:- High and narrow beams

Determine the crash rate - transportation, A five-mile long section of two-...

A five-mile long section of two-lane road has an AADT of 8,000.  There have been six crashes on this section of road during the past two years.  What is the crash rate? R sec

Explain information processing and perception, Explain Information Processi...

Explain Information Processing and Perception - Driver Performance The time required to respond successfully to any driving situation, such as an emergency, involves four stage

Stone, Explain briefly physical classifications of stone

Explain briefly physical classifications of stone

Estimating, a 45 cm deep roof beam is provided on 30 cm wall of a room size...

a 45 cm deep roof beam is provided on 30 cm wall of a room size 3.0m*5.0m . calculate the quantity of steel required in beam on percentage basis.

Geodesy, what is the difference between geodesy and plane survey

what is the difference between geodesy and plane survey

Define the net positive suction head, Define the Net Positive Suction Head ...

Define the Net Positive Suction Head All values in the equations are in units of feet.  Note: Only use values related to the suction side of the pump.   NPSHR = Net Posi

Describe the geophysical profileof borings, Describe the Geophysical Profil...

Describe the Geophysical Profileof Borings The variation in the thickness of the soil stratum for engineering application is known as the geophysical profile. Figure 1.2 shows

Calculate the invert elevation of the sewer pipe, 1. The center line elevat...

1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft.   The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd