Q. Good surface regularity for sub-base in concrete pavement?
Surfaces of sub-base material for concrete carriageway must be built in a regular manner due to the following reasons:
(i) One of the primary functions of sub-base in concrete pavement is to provide a smooth and even interface amid concrete slab andsubgrade so that a uniform support is established. A regular surface of sub-base helps in decreasing the frictional and interlocking forces between concrete slab and sub-base and allowing shrinkage movement andeasier temperature.
(ii) A uniform sub-base surface is required in the construction of concrete slab of uniform thickness adopted in design. It saves the higher cost of concrete to make up the needed level.
A footing foundation for a water tower carries a load of 9000 kN and is 3.6 metres square. It rests on dense sand of 9 m thickness overlying a clay layer of 3 metres depth. The cla
1. The center line elevation of the proposed roadway at station is 345+25.50 is 327.36-ft. The existing ground top of cut elevation (ft) is most nearly: 2. A design engineer c
A construction project involves excavation below grade. A 24 inch diameter dewatering well is installed from grade (EL 586) to 80 ft below grade to lower the water table. Soil bori
Differences between epoxy grout, cement grout and cement mortar? Epoxy grout comprises epoxy resin, epoxy hardener and aggregates/sand.As a matter of fact, there are various ty
Q. Explain the Design discharge for bridge waterway? Design discharge for bridge waterway should be a flood of 50 year frequency. For very large bridges damage to which is like
Q. What do you mean by Scour? Whenever a bridge crosses a waterway, even a small or intermittent one, scour is a dangerous effect that can damage bridge piers and undermine fou
1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%. The final volume of the compacted
procedure on conducting curves in field
Explain the crushing strength test
which section is most effective for a design of beam and why
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd