Q. Good surface regularity for sub-base in concrete pavement?
Surfaces of sub-base material for concrete carriageway must be built in a regular manner due to the following reasons:
(i) One of the primary functions of sub-base in concrete pavement is to provide a smooth and even interface amid concrete slab andsubgrade so that a uniform support is established. A regular surface of sub-base helps in decreasing the frictional and interlocking forces between concrete slab and sub-base and allowing shrinkage movement andeasier temperature.
(ii) A uniform sub-base surface is required in the construction of concrete slab of uniform thickness adopted in design. It saves the higher cost of concrete to make up the needed level.
Describe the features of physical survey phase The Physical Survey (field and laboratory test) for the purpose of determination of physical and engineering properties of the ma
Question What are main functions of bedding below storm water drains ? Answer Bedding that is normally made of granular resources or concrete serves four main functions as optio
influence diagram with example
picture of types of wall
The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr
The tensile strength of a material is the value at which the material fails when subjected to a tensile force. (Tensile means a force pulling the wood fibers lengthwise, as opposed
calculate height of instrument?
first of all i want to think you for this helpful website , and let me ask you this question . how to calculate w/c ratio ? thank you so much for you .
In a hydrometer analysis, 0.5 N of soil was mixed in water to form one litre of uniform suspen- sion. The corrected hydrometer reading after a lapse of 60 min. from the start of se
what is meant by fly levelling and when it is carried out ?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd