Define the term - pre- tensioning, Civil Engineering

Assignment Help:

Define the term - pre- tensioning

It is a method of prestressing in which tendons are placed, inside ducts or passages provided in concrete, after concrete gains sufficient strength. Tendons are then stretched and anchored at the ends of the concrete member. The transfer mechanism of prestressing force in this form of prestressing is different from that in the case of pre-tensioning. In this form of prestressing, the prestressing force is transferred to concrete through anchorages provided at the ends - not due to bond between concrete and tendons.


Related Discussions:- Define the term - pre- tensioning

Stability of column, what is end condition how effected length is calculate...

what is end condition how effected length is calculated

Dynamic force transfer test of shock transmission unit, Define Dynamic Forc...

Define Dynamic Force Transfer Test of Shock Transmission Unit? This test mainly prove the lock up capability of the device. The STU shall be loaded in tension from zero to the

Survey, how can find forebearing

how can find forebearing

Cement, CEMENT Cement is a normally used binding material in the constr...

CEMENT Cement is a normally used binding material in the construction. By burning a mixture of argillaceous (clay) and calcarious (calcium)  material at a very high temperature

Important items during level crossing inspection, Q.7.- Write the important...

Q.7.- Write the important items to be inspected during level Crossing inspection. How do you take census of traffic at level crossing. Ans.-Important items to be inspected duri

Edge piles take up more loads than central piles, Edge piles take up more l...

Edge piles take up more loads than central piles in rigid cap Because of the effect of interaction of individual piles, central piles tend to settle more than the edge piles w

Terminology of earthquake, TERMINOLOGY 1. Focus: The point on the fau...

TERMINOLOGY 1. Focus: The point on the fault where slip begins is the focus. It is also called as hypocentre 2. Epicentre: The point vertically above the focus on the su

Steady and uniform flow, During steady and uniform flow through an open cha...

During steady and uniform flow through an open channel of uniform cross section, a person claims that the specific energy of the fluid remains constant. A second person claims that

Construction of embankment, Construction of Embankment: The following...

Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed

Surveying, what is compass survey and and its method

what is compass survey and and its method

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd