Define the term - pre- tensioning, Civil Engineering

Assignment Help:

Define the term - pre- tensioning

It is a method of prestressing in which tendons are placed, inside ducts or passages provided in concrete, after concrete gains sufficient strength. Tendons are then stretched and anchored at the ends of the concrete member. The transfer mechanism of prestressing force in this form of prestressing is different from that in the case of pre-tensioning. In this form of prestressing, the prestressing force is transferred to concrete through anchorages provided at the ends - not due to bond between concrete and tendons.


Related Discussions:- Define the term - pre- tensioning

Aggregate value, how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

Stone, Explain the crushing strength test

Explain the crushing strength test

Timber, What is exogenous tree?

What is exogenous tree?

Explain Fluid mechanics or properties - specific gravity, Fluid Mechanics o...

Fluid Mechanics or Properties - Specific Gravity Dimensionless ratio of a fluid's density to some standard reference density. For liquids and solids, the reference density is p

Consideration of hazards in design, • Gas turbines produce noise, heat radi...

• Gas turbines produce noise, heat radiation and exhaust gas emissions that are potentially a danger to health • Fuel is flammable and there are hot surfacesand moving parts

Land Surveying, What is the difference between accuracy and precision.

What is the difference between accuracy and precision.

Pelton wheel, what is the use of the pelton wheel

what is the use of the pelton wheel

Distinguish among active and passive earth pressure, Distinguish among  'ac...

Distinguish among  'active' and 'passive' earth pressure. Describe clearly Rebhann's graphical construction method to evaluate the earth pressure on a retaining wall. What are t

What is the specific gravity of the soil, An oven-dried soil weighing 1.89 ...

An oven-dried soil weighing 1.89 N is placed in a pyknometer which is then filled with water. The total weight of the pyknometer with water and soil is 15.81 N. The pyknometer fill

Determine the crash rate - transportation, A five-mile long section of two-...

A five-mile long section of two-lane road has an AADT of 8,000.  There have been six crashes on this section of road during the past two years.  What is the crash rate? R sec

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd