In a company, inventory level is reviewed biweekly. If the parts used in an assembly have the lead time of one and a half week, what period should a forecast of requirements of parts cover for replenishment?

Solution

Forecast period = lead time + review period

= 1.5 weeks + 2 weeks

= 3.5 weeks

However, the replenishment of parts needs a forecast of requirements at least 3.5 weeks into the future.


Related Discussions:- Forecasting system outputs

Complete outer clutch lugs for deep cuts, Complete outer clutch lugs for de...

Complete outer clutch lugs for deep cuts: Visually check for any deep cuts formed on the outer complete clutch lugs.

Pendulum pump mechanism, describe about pendulum pump mechanism and dia...

describe about pendulum pump mechanism and diagram

Describe elastic and plastic deformation, Q. Describe Elastic and plastic d...

Q. Describe Elastic and plastic deformation? When a sufficient load is applied to a metal or other structural material, it will cause the material to change shape. This chang

Cover left crank case and check shifter drum, Open cover left crank case an...

Open cover left crank case and check shifter drum bolt and washer: Check shifter drum bolt torque and washer direction and avail ability.

Power sources for arc welding, POWER SOURCES FOR ARC WELDING Electric ...

POWER SOURCES FOR ARC WELDING Electric arc welding processes constitute a majority of all the welding processes. Most of the weldable materials can be joined by arc welding. D

Either wheel is wobbling motorcycle problem, If Either Wheel is Wobbling ...

If Either Wheel is Wobbling Causes of Problem Remedy Excessive wheel bearing play Distorted rim Improperly

Expression for strain energy, Expression for strain energy: Derive an...

Expression for strain energy: Derive an expression for strain energy because of torsion.                                          Sol.: The work done in straining shaf

Determine the required feed rate of seawater, Seawater is boiled in a 5 lit...

Seawater is boiled in a 5 liter kettle to produce drinking water.  In class we solved the steady-state version of this problem.  Here you are asked to consider the transient period

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd