Flange assembly with torque measurement, Mechanical Engineering

Assignment Help:

Q. Flange Assembly with Torque Measurement?

Select the proper bolts and gasket for the intended service. Use only new, undamaged gaskets.

Lubricate the bolt threads and nut bearing surfaces.

Install two bolts diametrically opposite each other, and one bolt halfway between the previously installed bolts for retaining the position of the gasket.

Insert the gasket and center it in the flange. Hand tighten the nuts to hold the gasket in place.

Install the remaining bolts and nuts. Hand tighten the nuts keeping the flange faces parallel. Take care to assure proper seating and centering of the gasket and all the nut threads are fully engaged. Longer stud bolts should be used if all the nut threads are not fully engaged.

Number and mark the bolts with the pattern described below in a clockwise direction around the flange starting at the top (12 o'clock).


Related Discussions:- Flange assembly with torque measurement

Grinding wheels, Grinding Wheels Implicated to be rotated at relativel...

Grinding Wheels Implicated to be rotated at relatively high rotational velocities within grinding machines, grinding wheels contain a surface of rotation about a central axis.

Electrodes- inconel electrodes, Inconel Electrodes These electrodes are u...

Inconel Electrodes These electrodes are used in the industries, like petrochemical, fertiliser, etc. The weld composition contain small percentage of alloying elements like V, Mo

Process of alloy materials sampling, Q. Process of Alloy Materials Sampling...

Q. Process of Alloy Materials Sampling? The following alloy-materials require a minimum of 10% per lot representative PMI sampling. If any incorrect material is found in repres

Tungsten inclusions, Tungsten Inclusions Tungsten inclusion is a disconti...

Tungsten Inclusions Tungsten inclusion is a discontinuity found only in TIG welding. Particles of tungsten from the electrode can be embedded in a weld when improper welding proc

Schedule evaluation, Schedule Evaluation Each continuations of a partia...

Schedule Evaluation Each continuations of a partial schedule that are produced in step 1 are ranked as per to their respective cost function. This cost function might be dissim

Determine the production rate, a) You were assigned to determine the produc...

a) You were assigned to determine the production rate for a polymer extrusion process. The extruder is found to have a barrel diameter = 4.5 in and length = 11 ft. The extruder scr

Harmonic motion equilibrium, (a) Split up the harmonic x = 8 sin(ωt + 45°),...

(a) Split up the harmonic x = 8 sin(ωt + 45°), into two harmonic motions, one of which has amplitude of 10 and phase difference zero. (a) A body is subjected to two harmonic mot

Determine steady state error, Derive mathematical equation for the time res...

Derive mathematical equation for the time response of a first order system subjected to ramp input. Draw the response curve and determine steady state error. Give some examples of

Evaluate the total deformation of the bar, (a) A member ABC is formed by co...

(a) A member ABC is formed by connecting a steel bar of 20mm diameter to an aluminium bar of 30 mm diameter, and is subjected to forces as shown in figure. Evaluate the total defor

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd