Cooling period of furnace pipe, Mechanical Engineering

Assignment Help:
We shutdown our furnace and always encountered crack on our piping at the weld joints. I investigated that upon shutdown the furnace cracking, our maintenance immediately remove the insulation of the piping. How many hours require prior to remove the insulation after shutdown.

Related Discussions:- Cooling period of furnace pipe

Evaluate the quantity of air passes, The cockpit of a jet plane flying at a...

The cockpit of a jet plane flying at a speed of 1200 km/hr is to be cooled by simple air cooling system. The cockpit is to be maintained at 25 0 C and pressure in the cockpit is 1

Strength of materials, sir/madam, i would like to teach online how can i ha...

sir/madam, i would like to teach online how can i have to proceed

How can we use cereals, Q. How can we use Cereals? Foundry cereal is fi...

Q. How can we use Cereals? Foundry cereal is finely ground corn flour or corn starch. It (0.25-2%) increases the green and dry strengths of the moulding sand. Since the cereal

Steam systems - air-conditioning guidelines, Ensure all low points on steam...

Ensure all low points on steam mains and equipment have drip trap assembly. High pressure condensate to be taken to flash tanks, provide detail of flash tank. Use minimum 24" (610

Laser weld overlay i cladding, LASER WELD OVERLAY I CLADDING This proce...

LASER WELD OVERLAY I CLADDING This process brings the metal surface to a substantially higher temperature than in the heat treating process and results in a thin molten surface

Higher engineering mathematics by bs grewal, give me the solutions for high...

give me the solutions for higher engineering mathematics by bs grewal

Quantitative Project Paper, Could I have 3 topic ideas with problem stateme...

Could I have 3 topic ideas with problem statement and research questions for each to pick one and send it to the expert? I have a project in Manufacturing Engineering, Master leve

Cscc in gas streams, Q. CSCC in Gas Streams? Due to process upset of FW...

Q. CSCC in Gas Streams? Due to process upset of FWKO or Treater, there may be chance of chloride carry over into the gas lines. Depending on the chloride contents of formation

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd