Fire fighting operations - high rise buildings, Other Engineering

Assignment Help:

Fire fighting operations - high rise buildings:

Inlets that allow the fire service to supplement to water to the sprinklers and to the fire mains are useful additions to the measures that assist fire fighting.

When fire fighting operations are being undertaken, doors to the fire fighting staircase are bound to be held open (by hose) so either ventilation or pressurisation must be provided to stop the stairs becoming smoke logged. Elements of a pressurisation system are automatic opening vents on each floor.                                         

These open to keep the area where the fire has started close to ambient pressure so that a pressure difference can be maintained to the staircase (the staircase being at a slightly higher pressure).  The vents also allow a continued through-flow of air when doors are open for fire fighting.  If the vents do not open or are obstructed because new internal partitions have been constructed, for example, then the space where the fire is will become pressurised, losing the pressure difference between it and the staircase and the through-flow of air when the door is open will not take place allowing smoke to enter the stairs.  Vents are normally required on at least  two faces of  the building  to  allow for  positive  wind pressures on one face of the building.

 

 

 


Related Discussions:- Fire fighting operations - high rise buildings

CHEMICAL ENGINEERING REACTIONS ASSIGNMENT, HI,I GOT ASSIGNMENTS TO TURN IN ...

HI,I GOT ASSIGNMENTS TO TURN IN WITHIN 24 HOURS.PLEASE IS THERE ANYWAY YOU COULD HELP OUT?

Discuss the heuristic search as applied to an and/or graph, Question 1 Wha...

Question 1 What is Artificial Intelligence? Discuss the two class of approaches followed for AI Question 2 Discuss the heuristic search as applied to an AND/OR Graph Ques

Embedded system, do u do embedded system assignment?

do u do embedded system assignment?

Flame photometer, please explain a bout blog diagram of flame photometer

please explain a bout blog diagram of flame photometer

Architecture.., draw folded plate roof structure on multi purpose hall?

draw folded plate roof structure on multi purpose hall?

Facilty design, List three advantages and three disadvantages of open offic...

List three advantages and three disadvantages of open office spaces.

Various cementing materials, The various cementing materials are classified...

The various cementing materials are classified as follows. a) Argillaceous cementing materials b) Calcareous cementing materials c) Carbonaceous cementing materials Argillaceous Ma

Differentiate crystalline and amorphous materials, Q.   Differentiate cryst...

Q.   Differentiate crystalline and amorphous materials? (a)Crystalline solids:  Those solids in which the, ions atoms or molecules in a definite regular repeated

Propeller track, PROPELLER TRACK An out of track propeller will suffer ...

PROPELLER TRACK An out of track propeller will suffer an imbalance caused by the Dynamic and Aerodynamic being out of balance. Propeller track is the path followed by a blad

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd