Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Two identical three-phase, 33-kV, wye connected, synchronous generators operating in parallel share equally a total load of 12 MW at 0.8 lagging power factor. The synchronous reactance of each machine is 8 per phase, and the armature resistance is negligible.
(a) If one of the machines has its field excitation adjusted such that it delivers 125 A lagging current, determine the armature current, power factor, excitation voltage, and power angle of each machine.
(b) If the power factor of one of the machines is 0.9 lagging, find the power factor and current of the other machine.
general functions of time base generator
DPR PREPARATION: 1. Asset Management 2. System Operations and Despatch 3. Field Operations 4. Customer Processes 5. Corporate Processes The details covered
A symmetrical fluctuating message, with |f(t)| max = 6.3 V and KCR = 3, is to be encoded by using an encoder that employs an 8-bit natural binary code to encode 256 voltage levels
how do you define the expertise for this hot line maintenance?
Submit a brief report on the selection of two commercially available sensors for the following: • Research and recommend a sensor for a real full size conveyor system of approxima
user defined function
Q. What will be the effects of an increase in real national income on the interest rate? Answer: An enhance in real national income will increase the interest rate. If
Consider the circuit of Figure (a) and obtain the complete solution for the voltage v C (t) across the 5-F capacitor and the voltage v x (t) across the 5- resistor.
Consider an elementary two-pole rotating machine with a uniform (or smooth) air gap, as shown in Figure, inwhich the cylindrical rotor ismountedwithin the stator consisting of a ho
Illustrates about the power dissipation management in embedded system? Power Dissipation Management a. Clever real-time programming through Wait and Stop instructions b.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd