Explain the term - Untensioned Reinforcement

In prestressed concrete construction, use of untensioned reinforcement also has to be made alongwith tendons. This is essential as tensile stresses produced because of prestress act in lateral directions. These stresses are taken up by untensioned reinforcement which is given in addition to tendons in lateral as well as longitudinal directions. The untensioned reinforcement is also required to take on stresses produced during the transport of the prestressed concrete members. 


Related Discussions:- Explain the term - untensioned reinforcement

Define diving equipments for underwater inspection of bridge, Define Diving...

Define Diving Equipments for Underwater Inspection of Bridge? Generally two types of diving, Scuba diving and surface supplied air diving, is employed in underwater inspection

Surveying land, principle of working from whole to part

principle of working from whole to part

Calculation of crack widths arising from thermal movement, Q. Calculation o...

Q. Calculation of crack widths arising from thermal movement In the calculation of thermal movement, the below formula is used in most codes: w max =s x a x (T 1 +T 2 )/2

Define project scheduling - types of methods, Define Project Scheduling - T...

Define Project Scheduling - Types of Methods Project Scheduling - Distinction between the Major Types of Schedule Diagrams Precedence Diagrams (PDM)   a) Activ

Softening point of bitumen, Hi, i need discussion for softening point of bi...

Hi, i need discussion for softening point of bitumen 7.5 ?C

Application of quadratic equation, list some applications of quadratic equa...

list some applications of quadratic equation in civil engineering

survey, what is fore bearing and back bearin

what is fore bearing and back bearing

Verify the optimum value of the spacing of the piles, A 16-pile group has t...

A 16-pile group has to be arranged in the form of a square in soft clay with uniform spacing. Neglecting end-bearing, verify the optimum value of the spacing of the piles in terms

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd