Explain the surface water treatment methods, Civil Engineering

Assignment Help:

Explain the Surface Water Treatment Methods

A. Physical Unit Operations

  • change in water quality is brought about through the application of physical forces
  • screening, mixing, gas transfer, sedimentation, filtration,...etc.

 

B. Chemical Unit Operations

  • Removal or treatment of contaminants is brought about by the addition of chemicals or chemical reactions
  • precipitation, disinfection, coagulation, oxidation, ion exchange

 

C. Biological Unit Operations

  • Removal of contaminants is brought about by biological means
  • used only for wastewater treatment and not for water treatment
  • activated sludge, trickling filter, oxidation ponds, lagoons....etc.

 

D. These processes are usually combined in most treatment systems


Related Discussions:- Explain the surface water treatment methods

Specification of wood work for door, Q. Specification of Wood work for Door...

Q. Specification of Wood work for Door? 1. General - Timber for door, window and ventilators frames shall be as specified. Timber shall be sawn in the direction of the grains.

Soil particles for geotechnical design, Question Will it worthwhile to ...

Question Will it worthwhile to take out tests on particle density of soil particles for geotechnical design? Answer Particle density of soils is definite by ratio of

Surveying, length of the line measured with 20m chain found to be 250m.calc...

length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long

Structural dynamics, A machine of 850 kg mass is acted upon by an external ...

A machine of 850 kg mass is acted upon by an external force of 1355 N at a frequency of 650 rpm. To reduce the effects of vibrations on the supporting structure, isolators having s

Heating season duration , Change the model to take into account the variati...

Change the model to take into account the variation in outdoor temperature for a "typical" day in the heating season based on the heat loss by the fabric and the heating of incomin

Pavements with Bitumen Emulsion, What is the rate of application of Prime c...

What is the rate of application of Prime coat over WBM

Define project schedule financial analysis, The 6 monthly payment applicati...

The 6 monthly payment application for the construction of a $70,000,000 University dormitory is analyzed and the summary accounting show: the budgeted cost of work performed is $14

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd