Q. Explain the reuse maintenance model with the help of a diagram.

Ans: Recycle maintenance model this model is based on the principal that maintenance could be viewed as an activity involving the reuse of existing program components

The recycle model has four main steps:

1. The Identification of the parts of the old system that are candidates for reuse.

2. The Understanding of these system parts.

3. The Modification of the Old system parts appropriate to the new requirements.

4. The Integration of the modified parts into the new system.

With the five recycle model the starting point may be any phase of the life cycle. The design, the requirements, the code or the test data: - distinctly other models.

1721_Explain the reuse maintenance model.png


Related Discussions:- Explain the reuse maintenance model

Explain different phases of spiral model, Q. Explain Different Phases of sp...

Q. Explain Different Phases of spiral model? 1) Planning: In this phase the objectives alternatives as well as constraints of the project are determined or documented. The ob

Explain the process of prototyping, Explain the process of Prototyping ...

Explain the process of Prototyping Prototyping is a process which enables developer to create a small model of software. IEEE 610.12 standard defines prototype as a preliminary

Illustrate key process areas of cmm, Q. Illustrate key process areas of CMM...

Q. Illustrate key process areas of CMM? The key process areas of CMM are 1. Requirements management that establishes a common relationship between the customer and developer

The roles of project stakeholders, The roles of project stakeholders :- ...

The roles of project stakeholders :- Offer resources (time, money, ...) to the project team Instruct developers about their business Be precise and specific about requir

Compute the mccobes cyclomatic complexity, Q. Compute the McCobes cyclomati...

Q. Compute the McCobes cyclomatic complexity? (i) compute the McCobe's cyclomatic complexity (ii) Find out independent path Ans (i) Cyclomate complexity V (

two fetch-execute cycles, Consider an 8-bit system with 32 memory location...

Consider an 8-bit system with 32 memory locations (numbered from 0 to 31) and 8 different instructions. Assume op code for "Load Accumulator" instruction is 5 10  and for "Add" ins

Explain throw-away prototyping and evolutionary prototyping, Q. Explain thr...

Q. Explain throw-away prototyping and evolutionary prototyping. Discuss the differences between the two. Ans Throw-Away Prototyping as well called close ended prototyping .

Unix, A friend has promised to log in at a particular time. However, he nee...

A friend has promised to log in at a particular time. However, he needs to be contacted as soon as he logs in. The shell script checks after every minute whether he has logged in o

Waterfall model is more advantageous than adhoc methods, Explain why waterf...

Explain why waterfall model is more advantageous than adhoc methods.      Ad-hoc Process Models- "Process capability is unpredictable due to the software process is constantly

Explain the per-action modeof QTP, Explain the Per-action modeof QTP ...

Explain the Per-action modeof QTP - Best used in below cases: - When creating simple record and run tests when there is just one or very few tests which correspond to int

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd