How a prototype can be categorised, Software Engineering

Assignment Help:

How a prototype can be categorised

1.  A paper prototype which is a model depicting human machine interaction in a form which makes user understand how such interaction, would take place.

2.  A working prototype implementing a subset of complete features.

3.  An existing program which performs all of the desired functions however extra features are added for improvement.

 


Related Discussions:- How a prototype can be categorised

Development phases of the detailed cocomo model, Q. Explain the development...

Q. Explain the development phases of the detailed COCOMO model. Ans A software development is performed in four successive phases which are as follows 1 : plan/requirement

Determine the problems of software maintenance, Determine the problems of s...

Determine the problems of software maintenance Software maintenance has the below problems: i)  It is very cumbersome to analyse and understand code written by somebody.

Drive an expression for peak manning of a project, Q. Drive an expression f...

Q. Drive an expression for peak manning of a project using Nordes - Rayleigh equation . Ans Norden Rayleigh curve utilized to approximate software project . M(t) =Man powe

Define cyclomatic complexity, Define Cyclomatic complexity Cyclomatic ...

Define Cyclomatic complexity Cyclomatic complexity :- This is a measure of the control complexity of a program. This control complexity may be connected to program understanda

What are the main objectives of reverse engineering, What are the main obje...

What are the main objectives of reverse engineering? The main objectives of the reverse Engineering process are: (i) It helps the companies to understand the difficulties

Explain the test case, Test Case A test case is a unit level document d...

Test Case A test case is a unit level document describing the inputs, steps of implementation and the expected result of each test condition for each requirement from the BRD.

What is cmmi assessment, What is CMMI assessment? Examines the processe...

What is CMMI assessment? Examines the processes used in an organisation and assesses their maturity in every process area. Based on a 6-point scale: Not performed;

Product engineering- concept, Product engineering is a system engineering ...

Product engineering is a system engineering approach which starts with system analysis. The system engineer identifies  the customer's requirement, determines economic and econ

Describe the prototyping methods in software process, Describe the prototyp...

Describe the prototyping methods in software process. Two methods i. Evolutionary prototyping - In this approach of system development, the early prototype is prepared and i

Define equivalence class, Equivalence class: -It shows a set of valid or in...

Equivalence class: -It shows a set of valid or invalid states for input conditions. An input condition is either a particular numeric value, a range of values, a set of related val

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd