Explain the quality assurance manager and project manager, Software Engineering

Assignment Help:

How do you differentiate the roles of Quality Assurance Manager and Project Manager?

Quality Assurance Manager (QA Manager) produces the process to be followed at every phase of SDLC. He defines the standards to be followed, the documents to be maintained and sets the standard for the product.

Where as it is the Project Manager's responsibility to make sure that the things defined by QA manager are being executed. He develops the product from start to finish with his team and ensures that the product which is to be rolled out is Defect free and it reaches the standards and views explained by QA Manager.

 


Related Discussions:- Explain the quality assurance manager and project manager

Paradigm, which paradigm tend to correspond with top down and bottom up des...

which paradigm tend to correspond with top down and bottom up design

Define a class diagram with example, Q. Define a Class diagram with example...

Q. Define a Class diagram with example? Class diagram: A class diagram in the UML (Unified Modelling Language) is a type of static structure diagram that describes the struct

Explain steps in building the structure chart, Q. Explain Steps in Building...

Q. Explain Steps in Building the Structure Chart? Steps in Building the Structure Chart 1. Identify top level modules as well as decompose them into lower levels 2. Add

Explain about subroutines, Subroutines  Frequently, the similar piece ...

Subroutines  Frequently, the similar piece of code must write over again in many dissimilar parts of a program.  Instead of repeating the code every time it is required, there

When must a function throw an exception, When must a function throw an exce...

When must a function throw an exception? A function must throw an exception when it's not able to fulfil its promise. As soon as function detects a problem which prevents it

What is parallel/audit testing, Parallel/audit testing is testing where the...

Parallel/audit testing is testing where the user reconciles the output of the latest system to the output of the present system to determine the new system performs the operations

Important issues related to srs, Q. Important issues related to SRS? (a...

Q. Important issues related to SRS? (a) System goals as well as requirements are different- Goal is a more general characteristics. For example Whole system must be designed in

Explain dynamic and static metrics, Dynamic and static metrics Dynamic ...

Dynamic and static metrics Dynamic metrics are closely related to software quality attributes It is relatively easy to measure the response time of a system (performance

What is a document version, What is a document version? Ans) A document ...

What is a document version? Ans) A document version is a first release (or complete re-release) of a document, as opposed to a revision resulting from issuing change pages to a

What is up time, What is Up time? "Up time" is the time period when a me...

What is Up time? "Up time" is the time period when a method is operational and in service. Up time is the sum of idle time and busy time.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd