Explain the difference between Latent and Masked Defect.
Latent Defect is one which has been in the system for a long time; but is discovered now. I.e. A defect which has been there for a long time and should have been detected earlier is called as Latent Defect. One of the reasons why Latent Defect exists is because exact set of conditions haven't met.
Masked Defect is a defect which is hiding another defect.
State the Advantages of Prototyping Advantages of prototyping outperform problems of prototyping. Hence overall, it's a beneficial approach to develop prototype. End user can'
Q.Illustrate Intermediate COCOMO model ? The intermediate COCOMO model approximation the software development effort by using 15 cost drivers' variables besides the size variab
Level 5 (Optimising) Organisation satisfies all the requirements of level-4. This is final level. Organisation at this maturity level is considered almost perfect. At this st
Mention some of the factors to be considered during System Modeling. Simplifications Assumptions Constraints
What is regression testing? Regression testing is the re-execution of some subject texts that have already been conducted to make sure that changes have not propagated unintend
Question: (a) Briefly explain the following concepts: (i) Encapsulation and its advantages (ii) Abstract class and its use (iii) Polymorphism and its advantages (b)
database mapping from class to database
Q. Explain the development phases of the detailed COCOMO model. Ans A software development is performed in four successive phases which are as follows 1 : plan/requirement
Disadvantage of Software package: There are some disadvantages which need to be looked into. They are: i) A commercial software package will have a number of built-in
Q. For the flow graph showed in figure compute McCabe's Cyclomatic Complexity. Ans: In this flow graph Number of regions are 5 hence the Cyclomatic complexity is = 5
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd