Explain the coefficient of permeability, Civil Engineering

Assignment Help:

A sand deposit of 12 m thick overlies a clay layer. The water table is 3 m below the ground surface. In a field permeability pump-out test, the water is pumped out at a rate of 540 litres per minute when steady state conditions are reached. Two observation wells are located at 18 m and 36 m from the centre of the test well. The depths of the drawdown curve are 1.8 m and 1.5 m respectively for these two wells. Verify the coefficient of permeability

 


Related Discussions:- Explain the coefficient of permeability

Earth fill dams, Ask question #Minimum 100E. The regulations and specificat...

Ask question #Minimum 100E. The regulations and specifications that followed for compaction works for earth dam in Oman words accepted#

Loss of prestress due to creep in concrete, Loss of Prestress due to Creep ...

Loss of Prestress due to Creep in Concrete Due to the phenomenon of creep, compressive prestress induced strains in concrete increase. Because of  it, strains of  tendons decre

Need Answer, EXPLAIN THE STRUCTURE OF EXOGENEOUS TREE WITH DIAGRAM ?

EXPLAIN THE STRUCTURE OF EXOGENEOUS TREE WITH DIAGRAM ?

Machanics, differentiate between moment & couple

differentiate between moment & couple

Road maintenance, find the details of road maintenance in our project work

find the details of road maintenance in our project work

Build of a cmplete home, how can we build a complete home on an area of 500...

how can we build a complete home on an area of 500 meter squares with garden and house and a garage

Aluminium sliding window detail drawings, what are the details of aluminium...

what are the details of aluminium sections and how are they connected for making a door or window

What is imp rest stores, Q. What is Imp rest Stores? Material obtained ...

Q. What is Imp rest Stores? Material obtained not for specific works but as a standing advance for the purpose of material urgent requirements as and when they arise should wit

Surveying, A pre- engineering base line was run down a very steep hill.rath...

A pre- engineering base line was run down a very steep hill.rather than measure horizontaily down hill with steel tape: surveyor measured the vertical angle with the theodolite and

Cross-sectional elements - geometric design of roads, Cross-sectional Eleme...

Cross-sectional Elements: The terms used in the cross-section of a road are : Carriageway The portion where traffic moves. Shoulder The portion outside the ca

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd