Explain about the pre-tensioning systems, Civil Engineering

Assignment Help:

Pre-tensioning systems

In the previous unit we have seen different steps in a pretensioning operation. Tendon wires or strands (formed as a rope type arrangement made of  several tendon wires) are stretched and concrete is cast in the moulds, as shown in Figure. When sufficient strength is gained by concrete due to hardening, tendon wires may be cut from outside and jacks may be removed.

 

 

2484_Civil engineering.png


Related Discussions:- Explain about the pre-tensioning systems

Mollusca, what is the taxonomy of phylum molluska

what is the taxonomy of phylum molluska

Explain hydrology and evaporation, Explain Hydrology and Evaporation Hy...

Explain Hydrology and Evaporation Hydrology: Study of the circulation of water in nature.    Evaporation: Water in the liquid state transforms to vapor. Evaporation occurs f

What is the loss of prestress due to shrinkage of concrete, What is the Los...

What is the Loss of Prestress due to Shrinkage of Concrete It is the loss of prestress due to shrinkage of concrete, which takes place in the initial stage of hardening of conc

Explain the fluid pressure at any point on the surface, Pressure at Any Poi...

Pressure at Any Point on the Surface of a Horizontal Plane  Fluid pressure is the same at any point on the horizontal plane because: 1.  The fluid specific weight is the sam

Explain the maximum spacing of piles, Q. Explain the Maximum spacing of pil...

Q. Explain the Maximum spacing of piles? One of the factors which affect the distribution of loads from the structures to each pile is assumption of flexibility of the pile ca

Radial flow pumps for small flows and high heads, Radial flow pumps for sma...

Radial flow pumps for small flows and high heads In radial flow pumps, a diffuser/volute is generally designed at it outlet to convert the kinetic energy obtained during the pu

State the coulomb wedge theory, A retaining wall is battered away from the ...

A retaining wall is battered away from the fill from bottom to top at an angle of 15° with the vertical. Height of the wall is 6 m. The fill slopes upwards at an angle 15° away fro

Manage civil work design, Ask question #Minimum 1Make a detailed list of al...

Ask question #Minimum 1Make a detailed list of all constraints and requirements to the bridge design00 words accepted#

Cement, Ask What is the density of cement?

Ask What is the density of cement?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd