Q. Explain about Surface Preparation?
All oil, grease, salts, and any other contaminants detrimental to the formation of a good coating bond or coating quality must be removed prior to the coating operation. Prior to blast cleaning the pipe shall be preheated to remove moisture. The pipe temperature shall be maintained at a temperature at least 5°F (3°C) above the dew point, but less than 300°F (150°C), during blast cleaning and inspection.
Suitable provisional caps shall be applied into both pipe ends in order to prevent abrasive and coating material from entering into the pipe. Care shall be taken to avoid damage to weld bevels and steel surfaces.
The blast cleaned surface shall be visually inspected for defects which would impair proper coating application. Defects shall be removed by grinding or hand filing. If defect removal is not possible, the joint shall be set aside for OWNER's inspection. The surface profile, measured from peak to trough, shall be 1.6 to 3.9 mils (40 to 100 μm), inclusive, and in accordance with the powder manufacturer's recommendations.
Residual blast products shall be suitably removed from the pipe surface by Clean Air Wash, or by High Pressure Water Wash followed by an air blast to remove excess water on the pipe. The internal surface of the pipe shall be cleaned by vacuum or blown with compressed air to ensure that no traces of blasting media remain in the pipe. Air shall be dry and free of oil and grease contaminants.
Clearance Volume ( V C ) : The nominal volume of the combustion chamber above the piston when it is at the top dead centre is the clearance volume. It is designated as V C an
4. Design a run-of-the river hydropower scheme for a river in the Scottish Borders with potential level different of 15 m carrying water from a catchment area of 14 km by 25 km. I
Evaluate stress induced in rod: The two copper rods and one steel rod lie in vertical plane and support load of 50kN together as shown in figure given below. Each rod is 25 m
Line Designation Tables (LDT's) (Appendix "D") are initially generated by the Piping designers. Design conditions are inputed by the Process discipline, and the Mechanical Engineer
How to solve wedge problems..can anyone just explain the method..
Illustrate Newton's law of viscosity. Explain the importance of viscosity in fluid motion. Describe the effects of temperature on viscosity of water and that of air? Discuss hyd
#draw a net sketch of the geometry of a single point tool.
WHAT IS THE HISTORY AND COMPOSITION OF CUPOLA FURNACE?
a masonry pier 3m*4m supports vertical load of 600kn at point (1.2,1),find stresses at corner of pier
Brinel l Hardness Test: Insert the Ball of diameter D in ball holder of machine. Make specimen surface free from dust and dirt. Make contact between the surface and ball b
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd