Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. Explain about Surface Preparation?
All oil, grease, salts, and any other contaminants detrimental to the formation of a good coating bond or coating quality must be removed prior to the coating operation. Prior to blast cleaning the pipe shall be preheated to remove moisture. The pipe temperature shall be maintained at a temperature at least 5°F (3°C) above the dew point, but less than 300°F (150°C), during blast cleaning and inspection.
Suitable provisional caps shall be applied into both pipe ends in order to prevent abrasive and coating material from entering into the pipe. Care shall be taken to avoid damage to weld bevels and steel surfaces.
The blast cleaned surface shall be visually inspected for defects which would impair proper coating application. Defects shall be removed by grinding or hand filing. If defect removal is not possible, the joint shall be set aside for OWNER's inspection. The surface profile, measured from peak to trough, shall be 1.6 to 3.9 mils (40 to 100 μm), inclusive, and in accordance with the powder manufacturer's recommendations.
Residual blast products shall be suitably removed from the pipe surface by Clean Air Wash, or by High Pressure Water Wash followed by an air blast to remove excess water on the pipe. The internal surface of the pipe shall be cleaned by vacuum or blown with compressed air to ensure that no traces of blasting media remain in the pipe. Air shall be dry and free of oil and grease contaminants.
What is the aim of PDES The aim of PDES is to provide an interface which permits the exchange of data of the entire product development cycle and production cycle, see also PDE
How does the maximum the 10'''' flange horizontal offset allowable.
An open test tube at 293 K is filled at the bottom with 24.2 cm of Hg, and 11.2 cm of water is placed above the Hg. Calculate the pressure at the bottom of the test tube if the atm
how can I represent spring force direction
parallel force s example
Clearly indicate fire dampers on ducts penetrating fire rated partitions, equipment rooms, duct shafts, ceiling outlets, etc. Detail fire dampers on drawings if required. For
Lighting System : The motorcycle lighting system consists of head light, turn indicators, brake lights and panel board lights. Figure shows a DC circuit of the electrical system
logical design of process planning
Q. Scope of pipeline systems? This specification covers the specific materials, surface preparation, method of application, quality assurance, and repair necessary for the appl
Compute the ratio of the torque: Compute the ratio of the torque transmitted by a hollow & a solid shaft of the similar material, length & weight. Solution d i = inte
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd