Q. Explain about Surface Preparation?
All oil, grease, salts, and any other contaminants detrimental to the formation of a good coating bond or coating quality must be removed prior to the coating operation. Prior to blast cleaning the pipe shall be preheated to remove moisture. The pipe temperature shall be maintained at a temperature at least 5°F (3°C) above the dew point, but less than 300°F (150°C), during blast cleaning and inspection.
Suitable provisional caps shall be applied into both pipe ends in order to prevent abrasive and coating material from entering into the pipe. Care shall be taken to avoid damage to weld bevels and steel surfaces.
The blast cleaned surface shall be visually inspected for defects which would impair proper coating application. Defects shall be removed by grinding or hand filing. If defect removal is not possible, the joint shall be set aside for OWNER's inspection. The surface profile, measured from peak to trough, shall be 1.6 to 3.9 mils (40 to 100 μm), inclusive, and in accordance with the powder manufacturer's recommendations.
Residual blast products shall be suitably removed from the pipe surface by Clean Air Wash, or by High Pressure Water Wash followed by an air blast to remove excess water on the pipe. The internal surface of the pipe shall be cleaned by vacuum or blown with compressed air to ensure that no traces of blasting media remain in the pipe. Air shall be dry and free of oil and grease contaminants.
Graphics Exchange Specification: Afterwards, an open meeting was held at the National Academy of Sciences on October 10, 1979. About 200 people attended to herald the birth of
Repair of surface defects in welds by chipping, grinding and gouging is permitted provided the thickness is not reduced below the minimum required. Removal of defects shall be ver
EXPLANE PLZZ
Cross Belt Drive: When shafts are rotating in the opposite direction, cross belt drive can be obtained. Figure In the diagram given to us pulley 'A' is called as
EQUIPMENT FOR RESISTANCE WELDING-Stored energy equipments Energy can be stored and further utilised for welding. One method of storing energy is in capacitors electrostat
Find velocity of the vehicle: A car having mass 400kg is moving with velocity of 20m/sec. A force of 200N that acts on it for 2 mins. Find velocity of the vehicle: (1) W
define operation research
A machine of mass one tonne is acted upon by an external force of 3000 N at a frequency of 1500 rpm. To reduce the effects of vibration, isolator of rubber having a static deflecti
Q. Postweld heat treatment? When the equipment data sheet specifies post-weld heat treatment either for service conditions or code requirements, welding, hammering (peening), o
Q. Setting and installations of insulation? The setting and installations of insulation shall be to Specification No. later. The steam drum surfaces shall be insulated with
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd