Q. Explain about Surface Preparation?
All oil, grease, salts, and any other contaminants detrimental to the formation of a good coating bond or coating quality must be removed prior to the coating operation. Prior to blast cleaning the pipe shall be preheated to remove moisture. The pipe temperature shall be maintained at a temperature at least 5°F (3°C) above the dew point, but less than 300°F (150°C), during blast cleaning and inspection.
Suitable provisional caps shall be applied into both pipe ends in order to prevent abrasive and coating material from entering into the pipe. Care shall be taken to avoid damage to weld bevels and steel surfaces.
The blast cleaned surface shall be visually inspected for defects which would impair proper coating application. Defects shall be removed by grinding or hand filing. If defect removal is not possible, the joint shall be set aside for OWNER's inspection. The surface profile, measured from peak to trough, shall be 1.6 to 3.9 mils (40 to 100 μm), inclusive, and in accordance with the powder manufacturer's recommendations.
Residual blast products shall be suitably removed from the pipe surface by Clean Air Wash, or by High Pressure Water Wash followed by an air blast to remove excess water on the pipe. The internal surface of the pipe shall be cleaned by vacuum or blown with compressed air to ensure that no traces of blasting media remain in the pipe. Air shall be dry and free of oil and grease contaminants.
Problem Type Aforementioned illustration relates to the class of non-cyclic scheduling problems characterized via the subsequent features. (a) The Flexible Manufacturing Sys
a) Define Economics Order Quantity. Derive, using neat diagram, the mathematical formula for economic order quantity. b) The purchase manager of an industrial unit is placing on
A plane wall (thermal conductivity = 10.2 w/m o c) of 100 mm thickness and area 3m 2 has steady surface temperature of 170 o c and 100 o c. Evaluate :- (i) The temperature
1. Produce the SW parts for the lugs, connector and tubes. Produce an assembly to FIT at the designated points. 2. Create your own, individual, blank, customised drawing te
TYPE OF DEFECTS AND THEIR SIGNIFICANCE Defects in weldments in general can be classified as follows: I. Defects involving inadequate bonding Lack of fusion Incom
Q. Qualifications of Welding Procedures? The Fabricator shall prepare and submit for review by Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR),
Processing Sequence for Manufacturing Coupling Nut Referring to the Figure 12 below, we now illustrate the processing sequence for manufacturing coupling nut.
type the indexing mechanism of jigs and fixture
Can you show us - Overall length of external surfaces, cm In image Material Cast Overall length of external surfaces, cm 0 to 30 30 to 60 60 to 105 1
Before I submit my papers, I need to have something in writing regarding confidentiality of my work. Please advise. Bill Bridges
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd