Explain a tube well, Electrical Engineering

Assignment Help:

Q. Explain a Tube Well?

Method of restoring or increasing the capacity of tube well is known as developing a Tube Wells. This is done to eliminate bridging of fine particles on the voids of the strainers. That is achieved by one of the following method -

a) Back water - by forcing compressed air in the tube well.

b) Surging - By raising & lowering of the Plunger in a well. Thus sand particles are subjected to severe agitation.

c) Gravel Packing - Around the tube well gravel of size varying from 12 mm to 50 mm are filled. It is increase the area around the well thus decrease the velocity of water.


Related Discussions:- Explain a tube well

List the uses of usart, List the uses of USART. USART- Universal Synch...

List the uses of USART. USART- Universal Synchronous Asynchronous Receiver-Transmitters. It is used to transmit and receive the data in serial communication mode. It is

Dad double add instruction , DAD Double Add Instruction The contents o...

DAD Double Add Instruction The contents of register  R P are added  to the  contents  of HL register pair  and results of addition is stored  in HL register pair. R P   may b

Assmblly language, hi PA DS:1234 = AB PA DS:1235 = CD if i typed mov DX,[...

hi PA DS:1234 = AB PA DS:1235 = CD if i typed mov DX,[1234H] WHAT SHOULD I GET IN DX ?

Electric Machines, Ask questiDesing a suitable double - layer lap windingon...

Ask questiDesing a suitable double - layer lap windingon #Minimum 100 words accepted#

Evaluate the voltage source, Q. For the capacitor shown in Figure connected...

Q. For the capacitor shown in Figure connected to a voltage source, sketch i(t) and w(t).

Datapath and a datapath logic cell, Explain what is meant by a datapath and...

Explain what is meant by a datapath and a datapath logic cell illustrating your answer by reference to a suitable function using diagrams as appropriate. Show using a diagram ho

Hi, Two projects using the principle of functional independence, increases ...

Two projects using the principle of functional independence, increases system accuracy?

Design an appropriate system, From a source with P in = 2.4 mW, we want to...

From a source with P in = 2.4 mW, we want to get P out = 60 mW at a distance l = 20 km from the source. α for the transmission line is given to be 2.3 dB/km. The available amplif

How the interrupts can be masked in 8086, How the interrupts can be masked/...

How the interrupts can be masked/unmasked in 8086? The 8086 interrupt priorities are concerned; software interrupts have the highest priority, followed by NMI followed by INTR.

Automatic frequency control , Discuss the requirement for automatic gain co...

Discuss the requirement for automatic gain control in AM receiver and automatic frequency control in FM. How are these 'control' voltage formed and used?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd