Estimate the size estimating the rcc structures, Civil Engineering

Assignment Help:

PART - A

1.  Can you enumerate the benefits of individual wall method of estimation?

2.  Estimate the single room of size  3m x 4m x height 3m  using individual wall method?

3.  Which method you will choose - center line method or individual wall method for estimation of buildings?

PART - B

4.  Write the parameters you should keep in mind while estimating the RCC structures?

5.  A singly reinforced concrete beam is 200 mm wide and 400mm deep to the center of the tension reinforcement which consists of 4 bars of 16mm diameter. If the stresses in concrete and steel are not to exceed 5N/mm2 and 140 N/mm2, Estimate the various materials for the said beam?.

6. A single room has four columns of size 400mm x 600mm x 3m. Estimate the total concrete required? Also estimate the various constituents of concrete? Use M20 grade of concrete? Assume the suitable data.

 


Related Discussions:- Estimate the size estimating the rcc structures

Determine the load which a square footing, Two load tests were performed at...

Two load tests were performed at a site-one with a 50 cm square plate and the other with a 75 cm square plate. For a settlement of 15 mm, the loads were recorded as 50 kN and 90 kN

What are some facts about concrete, Actually, drying is not directly linked...

Actually, drying is not directly linked to hardness in concrete. After concrete is poured, putting it in a wet environment by spraying it constantly with water will hasten its hard

Write a short note on economic span of a bridge, Q. Write a short note on E...

Q. Write a short note on Economic Span of a Bridge? The span for which the total cost of bridge will be minimum is known as the economic span. The ratio of Cost of super str

Aggregate value, how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

how to calibrate AGGREGATE IMPACT VALUE TESTING MACHINE

Calculate the parameters for setting out curve, Q For a curve of 50, apex ...

Q For a curve of 50, apex angle of 900 and transition length of 60m, calculate the parameters for setting out curve by a Theodolite for TTP, mid point of transition, CTP and a p

Why we need a high strength concrete in prestressing, Why we need a high st...

Why we need a high strength concrete in prestressing There is another aspect to why we need a high strength concrete in prestressing. Prestressed concrete is subjected to high

Survey, how to draw longitudinal profile

how to draw longitudinal profile

Graduate, fabrication methods of ironmongery

fabrication methods of ironmongery

Jetties, JETTIES: A jetty is a structure projecting into the sea from ...

JETTIES: A jetty is a structure projecting into the sea from the shore line for receiving ships. They are made of RCC trestles with a deck to accommodate railway track and roa

Principle of adding cooling pipes, Question What is key principle of a...

Question What is key principle of adding cooling pipes or yet using cold water for concrete in concreting operation? Answer These methods aim at reducing placing tem

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd