engineering economices, Other Engineering

Assignment Help:
2. A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 400,000bcy of common earth in a minimum of 130 working days of 5hrs each. The average height of excavation will be 15ft, and the average angle of swing will be 120o. The 3-cy shovel has a maximum digging height of 30ft and the 5-cy machine’s maximum digging height is 34ft. the efficiency factor will be a 45min/hour. Appropriate size haul units can be used with either shovel. How many days will it require to complete the work?

Related Discussions:- engineering economices

Adder /subtractor, operation of adder/subtraction by using truthtable

operation of adder/subtraction by using truthtable

#tmjjlitle.., Industries that manufacture racing cars prefers nickel based ...

Industries that manufacture racing cars prefers nickel based alloys for engine components and iron based alloys for structural parts. Justify this statement.

300 X zoom lens, How to calculate the field of views

How to calculate the field of views

Phase array modelling, QUESTION: Modelling of phase array antenna for medic...

QUESTION: Modelling of phase array antenna for medical imaging. INSTRUCTION: The expert must provide a correct mathematical model solution and detail by detail steps of how it can

Providing fire resistant - fire safety management, Providing fire resistant...

Providing fire resistant: If the building does not provide everyone with alternative exit routes then it may be acceptable for people to pass the fire if they are separated f

General, why should an aircraft maintenance technician be familiar with wel...

why should an aircraft maintenance technician be familiar with weld nomenclature

Multirate filters, obtain the polyphase structure H(Z)=1-3Z^-1/1+4Z^-1

obtain the polyphase structure H(Z)=1-3Z^-1/1+4Z^-1

Events and its efffeccts, i need to prepare my aasingment for financial dat...

i need to prepare my aasingment for financial data analysis for that i need 10 business events

Maintenance Requirement Analysis, Ask questioA wire rope used as a crane ho...

Ask questioA wire rope used as a crane hoist rope has a mean life of 530 days. The wire rope predominantly fails in a wear-out mode caused by either corrosion, abrasive wear or fat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd