Providing fire resistant - fire safety management, Other Engineering

Assignment Help:

Providing fire resistant:

If the building does not provide everyone with alternative exit routes then it may be acceptable for people to pass the fire if they are separated from the fire by fire resisting construction.

It is common for buildings to be designed in a way that does not provide everyone in the building with an alternative exit to which they can turn.  Any multi-storey building that only has a single staircase is bound to have people on each storey who have no choice but to use the staircase to escape. They are, in effect, up a vertical dead-end.

This is why staircases are enclosed in fire resisting construction with self-closing fire doors between them and the rooms.  With the staircase effectively enclosed so that it remains unaffected by fire or smoke for an extended period (typically 30 minutes) people will be able to easily pass down a staircase whilst a fire is in a room on the other side of the fire resisting construction and fire door.

When a protected escape route is created by enclosing it in fire resisting construction it is  important  that  the escape route does not  contain  anything  that  may catch  fire because if it did and those items did catch fire then people may not be able to pass the fire to get to safety.

 

 


Related Discussions:- Providing fire resistant - fire safety management

Case1, Flifla sells tomatoes every day in Suk al Marqazi, the downtown frui...

Flifla sells tomatoes every day in Suk al Marqazi, the downtown fruit and vegetable market. He finds that he can order tomatoes in crates of 25 kg and he is able to stock a maximum

ASSAYMENT, Ask que Discover ambiguities or omissions in the following state...

Ask que Discover ambiguities or omissions in the following statement of requirements for part of a ticket-issuing system: An automated ticket-issuing system sells rail tickets. Use

Local attraction, how can we find local attraction correction?

how can we find local attraction correction?

Case study, M/s XYZ Ltd manufactures a product “PLVS” at its plant at Meeru...

M/s XYZ Ltd manufactures a product “PLVS” at its plant at Meerut, the maximum capacity of which is 200 units per month. Details of raw materials which go into the making of 1 units

Difference between income & expenditure statement, Difference between incom...

Difference between income & expenditure statement P&L is to be ready by the Company or Dealing Origination which evolved in Dealing of any commodity or manufacturing of completed e

Digital electronics, i got a msg from u is that Dear Tutor ...

i got a msg from u is that Dear Tutor Congratulations!! You are successfully done with the process of quality check, now we are sending you the registration form

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd