Elimination of formwork with reasons, Civil Engineering

Assignment Help:

Question
For a long slender structure similar to beams, propping is compulsory after elimination of formwork with reasons?

Answer
After concreting, time at which arresting of formworks has not been too long; or else it would affect colour of concreted structures. For long span concrete structures, while they have attained enough strength to support their self-weight, creep deflection could occur in these structures if propping is not provided after removal of formwork. So, re-propping is carried out after take away formwork and these props have not been allowed to stand also long since creep loads might overstress them.


Related Discussions:- Elimination of formwork with reasons

Cantilever support reactions, A cantilever has two couples: 1st(clockwise, ...

A cantilever has two couples: 1st(clockwise, 15kNm) placed at (1/3)L from support and 2nd (anti-clockwise, 10kNm) at (2/3)L from the support. What should be the reaction at the sup

Explain the normal depth equation, Explain the Normal Depth Equation T...

Explain the Normal Depth Equation The equation is derived from the Chezy-Manning equation. As written below it determines the diameter of a circular storm or sanitary sewer wh

Define surface communication-underwater inspection of bridge, Define Surfac...

Define Surface Communication - Underwater Inspection of Bridge? It is not necessary to have voice communication in all situations, particularly for shallow dives where the dive

Theory of structures, haw do you salve a supple supported beam with a sprin...

haw do you salve a supple supported beam with a spring balance

What do you mean by guide bunds, Q. What do you mean by Guide bunds? Gu...

Q. What do you mean by Guide bunds? Guide bund may be given an elliptical shape separation of flow can be avoided better with such an alignment. Alternatively straight parallel

State the ultimate load capacity of the pile group, A group of 16 piles of ...

A group of 16 piles of 50 cm diameter is arranged with a centre to centre spacing of 1.0 m. The piles are 9 m long and are embedded in soft clay with cohesion 30 kN/m 2 . Bearing r

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd