Elements of production control, Operation Management

Assignment Help:

Elements of Production Control

1.Control of the Planning: Assure receipt of latest forecast data from sales and production planning bill of material data from product engineering and routing information from process engineering.

2.Control of Materials : Control of inventory and providing for issue of materials to the shop and movement of material within the shop.

3.Control Tooling : Determine the available of tooling and provide for issue of tools to shop department from tools cribs.

4.Control of Manufacturing Capacity: Determine the abailability of equipment and labour capacities and issue realistic production schedules and provide a means of recording completed production.

5.Control of Activities: Release order and information at assigned times.

6. Control of Quantity : Follow up to progress of production in order to ensure that the required quantities are processed at each production step and to ensure that corrective action is initiated where work fails to pass each stage of inspection.

7. Control of Material Handling: Release orders for movement of work to ensure availability of material as required at each stage of the operations.

8. Control of Due Dated: Check on the relation of actual and planned schedules and determine the cause of delays or stoppage that interfere with weekly schedules of work assigned to each machine or work center.

9. Control of Information: Distribute timely information and reports showing deviations from plans so that corrective action can b e taken and provide data on production perforation measurements for future planning.


Related Discussions:- Elements of production control

Explain exponential smoothing, An electrical contractor's records during th...

An electrical contractor's records during the last five weeks indicate the number of job requests Week: 1 = 22 requests 2= 24 requests 3= 20 requests 4= 23 requests 5= 24 requests

Process of reengineering according to hammer and champy, Explain the proces...

Explain the process of reengineering according to Hammer and Champy. Hammer and Champy (1993) explained the process of reengineering as "the basic rethinking and radical redesi

Define relationship among the different levels of management, 1. Show graph...

1. Show graphically, and explain, the relationship between the different levels of management, types of problems, and types of decisions. What do we mean by the term "bounded ratio

Explain the bargaining unit as technical workers, Jack is a 2nd level manag...

Jack is a 2nd level manager at Johnson Controls. His department includes 2 supervisors, 5 night shift security guards, 5 technical workers, 10 janitorial staff, and 25 manufacturin

Compute the expected monetary value, Superior Products Inc. is considering ...

Superior Products Inc. is considering two potential equipment alternatives for production of their best selling product line. Option 1 involves proven equipment: Fixed cost investm

Corporate social responsibility, explain the concept and practice of corpor...

explain the concept and practice of corporate social responsibility (CSR).

Performance & productivity measurement -theory of constraint, Performance &...

Performance & Productivity Measurement -Theory of Constraint Traditional financial measures of performance have been criticised by Kaplan and Norton (1992) who voiced thei

Explain rtp, Orange Company is allocating its advertising budget for its ne...

Orange Company is allocating its advertising budget for its new smartphone targeting graduate and undergraduate students in RTP. The company has invited representatives from the lo

Describe the lewin''s change process, Question 1: Change is often resis...

Question 1: Change is often resisted because of the uncertainty and ambiguity it creates, the concern that it might not be in the organisation's best interest. (i) Discuss

Explain what amount of safety stock is appropriate, Given this information:...

Given this information: Lead-time demand = 630 pounds Standard deviation of lead time demand = 40 pounds (Assume normality.) Acceptable stockout risk during lead time = 4

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd