ELECTRICAL DE-ICING SYSTEM MAINTENANCE:

Tests of the system must be carried out when the servicing schedule required it or when a component has been replaced.  Typical tests are outlined below.

  • Continuity and resistance checks should be carried out before the installation of a propeller or when the efficiency of an overshoe's heating surface is suspect. The values of resistance that the elements should have are laid down in the Maintenance Manual.
  • Insulation checks are required to ensure that there is no breakdown of the element's insulation from the propeller blades or other metallic objects.
  • Voltage proof checks are used to ensure that no insulation breakdown exists between the blade and heater element. They involve applying a high voltage between the blade and element and ensuring that no leakage exists. These checks are normally carried out after repairs to the overshoe.
  • Functional tests of the ice protection system chan be carried out noting the current displayed for each of the phases of a.c. power on the flight deck ammeter. To prevent overheating of the elements the engine must maintain a minimum speed while the heating is on, as this allows a flow of air over the blades and engine intake. Some types of aircraft reduce the voltage of the system when the air / ground sense is in the ground mode and this lower voltage must be taken into account when monitoring the ammeter.

Related Discussions:- Electrical de-icing system maintenance

Cash mangement, how to do a cash management project report ,including probl...

how to do a cash management project report ,including problems?example?

End centered tetragonal lattice in the bravis list, Q.  There is no end ce...

Q.  There is no end centered tetragonal lattice in the bravis list, but there is an end centered orthorhombic lattice. Explain why this is so? Ans.  A tetragonal system is

Procedures for starting and ground running of aircraft , Procedures for sta...

Procedures for starting and ground running: Before starting and ground running any gas turbine powered aircraft, several considerations must be taken into account. The first an

Engine PW4168 or PW4168A, How is the overspeed solenoid cutback valve opera...

How is the overspeed solenoid cutback valve operate when Engine overspeed happen?

Construction, What are the problems arises during construction and their so...

What are the problems arises during construction and their solutions

Aircraft fuel gauges, Aircraft fuel gauges Fuel gauge senders are capac...

Aircraft fuel gauges Fuel gauge senders are capacitor transducers that consist of concentric tubular electrodes from top to bottom of the tank. They are distributed at various

Timber, micro structure of exogenous tree

micro structure of exogenous tree

Computational aerodynamics-computer laboratory, A key part of the course is...

A key part of the course is the computer laboratories which will use a package for simulating flow around aerofoils developed by Patrick Hanley . A course licence has been purchase

Ten principles of engineering economic analysis, Ten Principles of Engineer...

Ten Principles of Engineering Economic Analysis 1. Money has a time value. 2. Make investments that are economically justified. 3. Choose the mutually exclusive investment alt

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd