Duration activity for cast-in-place foundation formwork, Civil Engineering

Assignment Help:

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF formwork for a cast-in-place concrete foundation using 3-crews.

Solution:   Apply the equation:  Durationactivity = Area / Productivity * Crew Size

Durationactivity =  200,000 - SF/ 1000-SF/ Crew-day * 3 crew = 66.67 days


Related Discussions:- Duration activity for cast-in-place foundation formwork

Define structural damage - underwater inspection of bridge, Define Structur...

Define Structural Damage - underwater inspection of bridge? Structural damage to the substructure below waterline can be classified as under: i. Construction damage or error

Estimate the net present worth - construction management, Three alternative...

Three alternatives are being considered for improving a street intersection.The annual dollar savings on account of the improvement is shown below.  Assume that the intersection wi

Example for beam flexure design, Example for Beam Flexure Design Select...

Example for Beam Flexure Design Select the lightest W section for the simply supported beam shown below.  The beam length is 12ft.  The nominal loading is: w d = 4.0 kip/ft (i

#overhanging beams, How to calculate point of contraflexion on an overhangi...

How to calculate point of contraflexion on an overhanging beam with udl

Indian standard codes, Indian Standard Codes All of the major countrie...

Indian Standard Codes All of the major countries like India, UK, USA, and Australia have their own standards for material standards, design procedures, testing standards, and

Solid block -calculating for design mix, Good evening sir, solid block''s d...

Good evening sir, solid block''s design mix calculated generally please explain and derive .

Shrinkage of concrete in prestressed members, Shrinkage of concrete in pres...

Shrinkage of concrete in prestressed members The shrinkage of concrete in prestressed members results in a shortening of ensioned wires and hence contributes to the loss of st

Auto cad drawing , im looking for someone to do drawing in autocad 3D 2013 ...

im looking for someone to do drawing in autocad 3D 2013 with report

Define the fatigue failure - underwater inspection of bridge, Define the Fa...

Define the Fatigue failure - underwater inspection of bridge? Fatigue failure results in the fracture of structural members as a consequence of repeated high loading.  Fatigue

Specify the various methods of soil exploration, Specify the various method...

Specify the various methods of soil exploration and mention the circumstances under which each is best suited. What do you mean by undisturbed sample? Define with a neat sketch

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd