Distributed Control Sytems, Electrical Engineering

Assignment Help:
1. Produce a fully-labelled sketch to show the components of a Direct
Digital Control system.

2. State the minimum number of printed-circuit cards required to construct a
basic controller, naming each of the cards.

3. Produce a sketch to show the construction of the data words on the data
highway.

4. Explain the use of the different MODES of control available in a
controller of a Distributed Control System.

5. The Instrument Engineer, designing a Distributed Control System, has
available to him Basic Controllers and Advanced Controllers. List all
the reasons why an Advanced Controller might be used in preference to a
Basic Controller, making reference to the full processing capabilities of
the advanced controller.

6. Describe the difference between notified status and change detect points
and list the types of cards to which this applies.

7. Describe the main purpose of sequence programmes and state what would
require to be done in the writing of a programme which was too long to fit
in one sequence slot, making reference to the problem which this could
cause.
8. Describe the data presented to the operator on the Detail page display of
the operator station. List six different items of data which would be
presented for a control loop data point, and state whether the operator
would be able to change the values pertaining to these items.

9. State the limitations of the data highway system and what attributes of the
advanced distributed control system help to overcome these.

10. Explain the token passing technique used for advanced distributed control
system communications on the LAN, describing the procedure for a
newly powered up module to join the system.

11. Describe in detail the different types of alarm generated on the advanced
distributed control system.

12. Using the information below, produce a set of calibration figures for the
control loop TICA1495.
TI1495 range = 100 to 420°C
TICA1495 SP = PV = 300°C
TCV1495 = 30%.

13. An operator, using the operator interface, will have the operator station in
operator personality. Describe the requirement for ''personalities'' within
the DCS, making reference to other personalities available, and explain
how different functions are denied to unauthorised persons within the
operator personality.

14. Describe a procedure for adding a new data point to the distributed
control system data base and making this new point available to the
operator.




15. Provide a list of the five major factors to be taken into account when
considering the choice of a distributed control system for any given
installation, stating the benefits to be gained from the use of DCS for an
offshore oil and gas processing plant.

16. Describe the differences in communication protocol between the
Honeywell TDC2000 and Honeywell TDC3000 distributed control
systems. State the name of the device used to enable these two systems to
talk to each other.

17. All of the distributed control systems have the ability to use a data
historian module. List the main tasks of a data historian attached to a
DCS.

18. Describe the use of Group Points, stating which of the manufacturer''s
systems these apply to.

19. Describe the functions of a Highway Traffic Director, and state which of
the manufacturer''s systems does not require the use of this device.

20. Where would an HIA be installed and what are its functions?

21. Explain the reasons behind the installation of distributed control systems
in refineries for the control of natural gas liquids fractionation plant.

Related Discussions:- Distributed Control Sytems

A synchronous motor with a synchronous reactance , A synchronous motor with...

A synchronous motor with a synchronous reactance of 12 ohms is operating with a current of 100 A at unity power factor supplying power to a large compressor. The phasor diagram for

Explain protected mode interrupt, Explain protected mode interrupt. In...

Explain protected mode interrupt. In this mode, interrupts have exactly similar assignments as in real mode, but the interrupt vector table is not same. In place of interrupt

Explain magnetic property of ferromagnetic materials, The critical temperat...

The critical temperature above which the ferromagnetic materials lose their magnetic property is known as (A) Hysteresis.                                   (B) Curie point.

Autotransformer, conversion of auto transformer in to winding transformer a...

conversion of auto transformer in to winding transformer and vice versa

Trivector meter, Trivector Meter A trivector meter is designed to reco...

Trivector Meter A trivector meter is designed to record active, reactive and apparent energy along with MD indicators on all. The trivector meter is a compact unit.  It exchan

Which Transistor configuration best to use in cascade, Q. Which of the 3 tr...

Q. Which of the 3 transistor configuration is best to use in cascade if maximum voltage gain is to be realized?  The common collector configuration is not used for intermediate

What is the direction of a line of flux, What is the Direction of a line of...

What is the Direction of a line of flux The direction of a line of flux is from the north pole to the south pole on the exterior of the magnet and is then supposed to continue

Resonance, i want to plot a system current transfer matrix element vs frequ...

i want to plot a system current transfer matrix element vs frequency curve.how can i draw it?any suggestion.

Create a time diagram - conveyer, When the PLC is in the RUN mode it will s...

When the PLC is in the RUN mode it will switch ON the conveyer so it will run continuously. This project is divided into four outcomes: (a)    Detect block on entry, close

Flex routing , Flex Routing : You can see that your labour will have bee...

Flex Routing : You can see that your labour will have been in vain unless you take steps to ensure that flexes are routed safely and well clear of possible sources of danger.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd