Determine the Statements about Unit Area or Borrow Pit?

Ans: I.  Sometimes called Average Depth

II. Works well for volumes for building sites and surface mines

III. Needs grid survey for best results

IV. Not a good choice for roads

V. Based on the principle of measuring material based on adding or removal from pit, hence, Borrow Pit

 


Related Discussions:- Determine the statements about unit area or borrow pit

Difference between soft wood and hard wood, The classification as soft wood...

The classification as soft wood and hard wood has commercial significance. The difference between soft wood and hard wood is described below: The color of soft wood is light

Two property rule , The state of a pure substance of given mass is defined ...

The state of a pure substance of given mass is defined by specifying two appropriate properties provided that 1. The system is in equilibrium 2. Gravity, motion, electricity,

What are the various impurities in water, Q. What are the various impuritie...

Q. What are the various impurities in water? Ans.- Impurities in water - The impurities in water are classified as - i. Suspended Impurities. ii. Colloidal Impuritie

Plagiarism, what is the importance of plagiarism in civil Engeneering

what is the importance of plagiarism in civil Engeneering

Define wastewater treatment processes, Define Wastewater treatment Processe...

Define Wastewater treatment Processes The wastewater treatment processes that we design mimic the processes that occur in the nature (for example processes that occur in a flow

Reliability of settlement computations, Inspite of the problems of sample d...

Inspite of the problems of sample disturbance, if 1) e or E vs log p curve is interpreted, reasonably with some corrections for sample disturbance, 2) if the sample disturbance

Influence lines for cantilever beam, fine the influence line for cantilever...

fine the influence line for cantilever beam of span 7 m and load at 2 m?

Compaction, describe how quality control is maintained in a rolled fill dam...

describe how quality control is maintained in a rolled fill dam

Duration activity for cast-in-place foundation formwork, A concrete contrac...

A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd