Determine the full load voltage regulation, Electrical Engineering

Assignment Help:

A 25KVA, 3 phase, wye-connected, 400v synchronous generator has a synchronous impedance of 0.05 +j1.6 ohms per phase. Determine the full load voltage regulation at

(a) 0.8 power factor lagging,

(b) Unity power factor,

(c) 0.8 power factor leading.


Related Discussions:- Determine the full load voltage regulation

Transistors, what is transistor how it works?

what is transistor how it works?

Merits and demerits of stepper motor - stepper motor , Merits and Demerits ...

Merits and Demerits of Stepper Motor Followings  are the  merits and demerits  of stepper motors. Merits : a.They are compatible  with digital systems b.For the co

What are the basic operations of a computer, What are the basic operations ...

What are the basic operations of a computer? The basic operations are READ and WRITE.

Explain how switching systems are classified, Question 1 Explain how switc...

Question 1 Explain how switching systems are classified Question 2 Explain the function of pulse dialing in rotary dial telephone Question 3 Explain the functioning of crossba

About on line teaching, i am Eectrical engineer and i want to teach student...

i am Eectrical engineer and i want to teach students on line mode. let me know the procedure. thanks pushpendra

Draw a one-line diagram of three-phase distribution system, Q. A three-phas...

Q. A three-phase transformer bank consisting of three 10-kVA, 2300:230-V, 60-Hz, single-phase transformers connected in Y- is used to step down the voltage. The loads are connecte

Compare mosfet with jeft, Compare MOSFET with JEFT ? a. In enhancement ...

Compare MOSFET with JEFT ? a. In enhancement and depletion types of MOSFET, the transverse electric field induced across an insulating layer deposited on the semiconductor mate

What do you mean by the term procedure, What do you mean by the term proced...

What do you mean by the term procedure? PROC: The PROC and ENDP directives specify the start and end of a procedure. Such directives force structure while the procedure is cle

3-phase 4 wire meters with ct and md, 3-Phase 4 Wire Meters with CT and MD ...

3-Phase 4 Wire Meters with CT and MD If load is commonly more than 50 A, CT operated meters should be used. It is to be remembered that CTs should be properly selected for acc

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd