Determine the average time in the queue, Mechanical Engineering

Assignment Help:

A machine machines parts in exactly 1.5 minutes. The machine requires tool change according to an exponential distribution with a mean of 12 minutes between occurrences. The tool change time is also exponentially distributed  with a mean of 3 minutes.  Parts arrive for processing exactly every 2 minutes. 

Simulate the system for 10 hours. Determine the average time in the queue before the machine for three cases as follows (focus: breakdowns):

a.  Take randomness into account as stated above.

b.  Ignore the randomness (treat the breakdown data as deterministic).

c.  Assume that the machine has no breakdown, but that the processing time is 1.875 minutes.


Related Discussions:- Determine the average time in the queue

Explain the evaluation phase of auger shaft, Explain the Evaluation Phase o...

Explain the Evaluation Phase of auger shaft Evaluation Phase of auger shaft Steps: 1. To judge the ideas generated in the creation phase for ability to meet the required

CIM, discuss the main components of computer aided manufacturing

discuss the main components of computer aided manufacturing

MRP 1, Advantages and disadvantages

Advantages and disadvantages

Clutch spring height-clutch slipping, Clutch spring height: Check clutch s...

Clutch spring height: Check clutch spring height with a Vernier caliper. Spring height should be of minimum height of 25.55 mm.

Newton law of motion - second law, Newton law of motion: Secon d Law...

Newton law of motion: Secon d Law The rate of change of momentum is proportional to external force applied on the body and take place, in the same direction in which the

Describe poissons ratio, (i) Describe Poisson's Ratio. (ii) A circular r...

(i) Describe Poisson's Ratio. (ii) A circular rod of 100mm diameter and 500 mm length is subjected to a tensile force of 1000 KN. Calculate the modulus of bulk modulus, rigidity

Determine the value of shunt connected capacitance, An electric heating ele...

An electric heating element is rated at 4.0kW when connected to a single phase 240Vrms, 50 Hz AC supply, and is known to have a power factor of 0.833 lagging. 1. Calculate the c

What is the make group of euler operators, The Make Group of Euler Operator...

The Make Group of Euler Operators The Make group consists of four operators for adding some elements into the existing model creating a new one, and a Make-Kill operator for ad

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd