Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Aggregates, list the properties of aggregates

list the properties of aggregates

Scales and sludges, Discussscales and sludges. Writea note on internal trea...

Discussscales and sludges. Writea note on internal treatment of water

Rectangular panel inside a false work, Question In erection of false work, ...

Question In erection of false work, for a rectangular panel inside a false work would it be braced all along two diagonals ? Answer While a rectangular panel is focus to the

Levelling, 1 advantages and disadvantages of rise and fall methodes

1 advantages and disadvantages of rise and fall methodes

Raft and beam foundation, why is weight of raft not considered in structura...

why is weight of raft not considered in structural design of raft and beam

Theorem of three moments, Theorem of three moments: You have been intr...

Theorem of three moments: You have been introduced to the analysis of one of the important class of structures, namely Statically Indeterminate Structures. You have been intro

Full bore flow in drainage design, Q. Full bore flow in drainage design? ...

Q. Full bore flow in drainage design? In the design of gravity drainage pipes, full bore flow capacity is usually adopted to check against design runoff. Though one should note

Concrete, what are the appropriate methods of concreting

what are the appropriate methods of concreting

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd