Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Mathcad prime2.0, I want to ask about mathcad prime 2.0, when I want to sav...

I want to ask about mathcad prime 2.0, when I want to save my work it shows that I can''t save it because Excel is busy ,, what I have to do to fix this problem ??

Why are steel plates inserted inside bearings, In designing of elastomeric ...

In designing of elastomeric bearings, why are steel plates inserted inside Bearings?

Closing and opening of expansion joints and contraction join, Question ...

Question In case of for unreinforced concrete carriageway, what will succession of closing and opening of expansion joints and contraction joints? Answer Take a case t

Define the reservoirs - hydraulic system, Define the Reservoirs - Hydraulic...

Define the Reservoirs - Hydraulic System Typically designed for multiple functions - clean water supply, creating recreational opportunities and flood protection. Reservoirs ar

Explain fluidized-bed incinerators, Explain Fluidized-Bed Incinerators ...

Explain Fluidized-Bed Incinerators sand is heated to 800C by oil or gas and blown around (fluidized) by a blower that sends air from bottom upward heated fluidized san

Bronze is an alloy of materials, Bronze is an alloy of which materials? ...

Bronze is an alloy of which materials? Answer : Bronze is an alloy of copper.

Product layout, Product Layout: Imagine a factory manufactures taps, d...

Product Layout: Imagine a factory manufactures taps, drills, reamers and cutters. The production of each of these items needs different machines which may be placed in differe

State the term directly below the edge of the footing, The load from a cont...

The load from a continuous footing of 1.8 metres width, which may be considered to be a strip load of considerable length, is 180 kN/m 2 . Verify the maximum principal stress at 1.

Explain the influence line-moment, Influence line-moment 1.  Replace th...

Influence line-moment 1.  Replace the point of interest with an imaginary hinge. 2.  Rotate the beam one unit rotation by apply equal but opposite moments to each of the two

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd