Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Functions of a column in a building, What are the functions of a column in ...

What are the functions of a column in a building? Ans) A column is used to handle the weight of the roof and/or the upper floors. Now days, many columns are used for decorative

Rocks, Define rocks,types of rock,rock formations

Define rocks,types of rock,rock formations

State the ground water levels, Ground Water Levels The location of the...

Ground Water Levels The location of the ground water level is essential for deep excavation, water-logged areas. The existing wells in the nearby vicinity of the proposed site

Defects of timber, what are defects in timber occur due to natural causes?

what are defects in timber occur due to natural causes?

Difference between direct circulation and reverse drilling, Question Wh...

Question What is main difference between direct circulation drilling and reverse circulation drilling? Answer In straight circulation drilling and reverse circulati

Define the crash rate for intersection, An intersection has a total enterin...

An intersection has a total entering traffic volume of 42,000 vehicles per day.  During the past three years, there have been a total of 35 reported intersection-related crashes.

Bituminous macadam, What is the working capacity of a road paver per hour f...

What is the working capacity of a road paver per hour for bituminous macadam

Mohrs circle, The state of stress at a point is given through the stress co...

The state of stress at a point is given through the stress components sx = 70 MPa, sy = 10 MPa, and txy = - 40 MPa. Using Mohr''s circle find (i) Principal stresses, and (ii) Princ

Evaluate the principal stresses and principal planes, Evaluate the principa...

Evaluate the principal stresses and principal planes: The state of stress at a point in a loaded solid is prescribed on two faces of an element whose shape is a triangular pri

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd