Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Calculate the total board feet, A project engineer has ordered 100 hardwood...

A project engineer has ordered 100 hardwood boards, 1-1/4-in thick by 8-in wide and 8-ft long.  The total board feet ordered is most nearly:  Solution: 1.25" x 8" x 8' x 100

Importance of racking load for a pre-stressed concrete beam, Importance of ...

Importance of racking load for a pre-stressed concrete beam Evaluation of cracking load for a pre-stressed concrete beam member is important for the following cases/reasons.

Geotech, for zero air void line sr is

for zero air void line sr is

Online job, I am M tech in civil engg looking for online assignment job.

I am M tech in civil engg looking for online assignment job.

Project management, Project Management: This unit starts with the gene...

Project Management: This unit starts with the general definition of Project management. Several phases involved in project management are also desribed. Further, the technique

What is dead weight, Dead weight Dead loads are the weight of perma...

Dead weight Dead loads are the weight of permanent components of the structures such as the weight of the elements and spheres, casing weight, weight of the false ceiling a

Acid test - tests on stones, Acid Test: This test is usually carried...

Acid Test: This test is usually carried out on sand stones to examine the presence of calcium carbonate that weakens the weather resisting quality. In this particular  test,

Write a short note on economic span of a bridge, Q. Write a short note on E...

Q. Write a short note on Economic Span of a Bridge? The span for which the total cost of bridge will be minimum is known as the economic span. The ratio of Cost of super str

Zones of smear around vertical drains, Zones of smear around vertical drain...

Zones of smear around vertical drains Smear zones are produced during the installation of vertical drains in that zone of soils surrounding the band drains are disturbed. Soil

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd