Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Enthalpy, h = u + pv is a combination of properties and hence must also be ...

h = u + pv is a combination of properties and hence must also be a property.  h is the SPECIFIC ENTHALPY in kJ/kg  H = U + pV is the ENTHALPY in kJ

Foundation depth and arrangement, Foundation Depth and Arrangement: Th...

Foundation Depth and Arrangement: There are two types of foundations, viz, (a) Shallow foundations, also known as open foundations, and (b) Deep foundations. Slab cul

Difference between compaction and consolidation of soil, Briefly explain th...

Briefly explain the difference between compaction and consolidation of soil. What is the effect of compaction on soil properties? Ans.- Compaction - The process of increas

Length is constructed in first phase of construction, In construction of a ...

In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc

What is the meaning of concordant prestressing, Concordant Prestressing ...

Concordant Prestressing In this type of prestressing, tendons follow a concordant profile. The concordant profile of  tendons does not change the support reactions in a statica

Explain the bolted connections, Explain the Bolted Connections a) Quest...

Explain the Bolted Connections a) Questions generally relate to the size of the bolt needed for a connection or b) Number of bolts for a given loading and specified size

R.c.c design, how to write the beam design using c -language

how to write the beam design using c -language

Culverts, Can anyone help me in finding the formula for submerged and unsub...

Can anyone help me in finding the formula for submerged and unsubmerged flow in culverts?

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd