Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Types of loads and resulting stresses, • Applied loads result in internal f...

• Applied loads result in internal forces consisting of a shear force (from the shear stress distribution) and a bending moment (from the normal stress distribution) • Bending s

Timber grading, IS 883-1970 classifies the structural timber into 3 grades-...

IS 883-1970 classifies the structural timber into 3 grades-select grade, grade I and grade II

What is froude number - hydrolic system, What is Froude Number? Used to...

What is Froude Number? Used to determine if the flow is rapid, critical or tranquil.  Fr = 1 critical flow; Fr 1 supercritical flow In rectangular open channels:  Fr =

Key role of drilling fluid in rotary drilling, Question What is key rol...

Question What is key role of drilling fluid in rotary drilling in site search? Answer Drill fluid in rotating serves two main reasons. (i) Facilitate rotation of

Lock entrance - docks, Lock Entrance: Wet docks have lock entrances to...

Lock Entrance: Wet docks have lock entrances to overcome the high fluctuations in water level in the sea. Figure 7 gives a layout of a lock entrance. It consists of a lock cha

Break even point, Break even point: EM Electricals, Inc., contains fix...

Break even point: EM Electricals, Inc., contains fixed costs of Rs. 600,000 this period. Variable costs involved labour charges of Rs.100 per unit and material cost of Rs. 200

Addition of water to bored piles, Addition of water to bored piles In ...

Addition of water to bored piles In water bearing ground, some water head (about 1 m) above the existing ground water table is sustained to stabilize the bore at the time of e

False set in pile driving, Q. False set in pile driving? For pile drivi...

Q. False set in pile driving? For pile driving in certain soils such as dense silt and weathered rock, occurrence of false set phenomenon isn't uncommon. During the driving pro

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd