Determine about the post-tensioned concrete, Civil Engineering

Assignment Help:

Determine about the post-tensioned concrete

The transfer stage may take place after a long time from the casting of concrete, in the case of post-tensioned,members, enabling the concrete to achieve a very high strength. This is the reasoA that IS :1343-1980 specifies a larger minimum concrete grade of M 40 (a concrete mix whose 15 cm cubes achieve a compressive strength of 40 N/mm2 after 28 days of curing in water under specified conditions of temperature) compared to M 30 grade of concrete in the case of post-tensioned concrete members.


Related Discussions:- Determine about the post-tensioned concrete

Varignon theorem, how to prove varignon theorem in easiest way

how to prove varignon theorem in easiest way

School building, from surveying to school building finish

from surveying to school building finish

Window, sliding window lowered window sash or glazed window circular window...

sliding window lowered window sash or glazed window circular window

Show the functions of sleepers in railway, Q. Show the Functions of sleeper...

Q. Show the Functions of sleepers in railway? Functions of sleepers in railway works are as below:  (i)  The primary function of a sleeper is to grip the rail to gauge and t

Contours, how can you draw contours of a non square grid?

how can you draw contours of a non square grid?

Shallow foundations, The drainage system of a cantilever wall shown in Figu...

The drainage system of a cantilever wall shown in Figure As 1 became blocked after a heavy rainstorm and the groundwater level, which was originally below the base, rose to1.5 (m)

Explain the shrink factor of soil, Explain the Shrink Factor of Soil In...

Explain the Shrink Factor of Soil In addition to the swell factor and its associated load factor, soil also has a shrink factor. While the first two relate the volume of an equ

Define the net positive suction head, Define the Net Positive Suction Head ...

Define the Net Positive Suction Head All values in the equations are in units of feet.  Note: Only use values related to the suction side of the pump.   NPSHR = Net Posi

Chain surveying, Chain Surveying: In the chain surveying, you have stu...

Chain Surveying: In the chain surveying, you have studied the basics of chain surveying. In chain surveying, various equipment and instruments are used for measuring distances

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd