Q. Design the drainage area?

Areas beneath equipment or vessels subject to spills or leaks shall have slope drainage area. Every skid shall be provided with floor drains.

Skids supporting equipment with no building envelope shall have drainage area constructed with minimum 6 mm plate for maximum unsupported spans of 1050 mm. A 100 mm high curb plate shall be provided all around the skid. Continuous sealed weld shall be used to weld curb plate to floor.

Installation of curb plate for drainage area applies only to skids with possible spills or leakage from piping or equipment.


Related Discussions:- Design the drainage area

Camprofile, knifer edge follower program in java

knifer edge follower program in java

Shear stress, write the assumption made in derivetion of shear stress produ...

write the assumption made in derivetion of shear stress produced in circular shaft subjected to torsion

Nature of bending stress, Natur e of Bending Stress If the beam is not...

Natur e of Bending Stress If the beam is not loaded, it will not bend as shown in the figure-a. But if the beam is loaded, it will bend as shown in the figure-b, whatever may

Determine mean coil radius - close coiled helical spring, Determine Mean co...

Determine Mean coil radius - close coiled helical spring:  A close coiled helical spring contains a stiffness of 1 kN/m in compression to a maximum load of 50 N and a maximum

Higher engineering mathematics by bs grewal, give me the solutions for high...

give me the solutions for higher engineering mathematics by bs grewal

Cutting technology., can you explain about merchant circle,cutting forces

can you explain about merchant circle,cutting forces

Methods of analysis of trusses, Methods of analysis of trusses: What ...

Methods of analysis of trusses: What are the methods of analysis of trusses? What is found when the analysis of a system is done? Sol.:  The forces in the members of

Wet h2s corrosion, There is risk of wet H 2 S corrosion in all emulsion and...

There is risk of wet H 2 S corrosion in all emulsion and gas lines from the Inlet Separator up to and including the Treater. Full compliance to NACE is highly recommended to contro

Solid Mensuration, How di i get the volume of a regular pentagon if the giv...

How di i get the volume of a regular pentagon if the given was a height of 9", a base of 3" and a central angle of 75

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd