Define conceptual engineering phase for project, Mechanical Engineering

Assignment Help:

Q. Define Conceptual Engineering Phase for project?

The primary objective of this stage is to include and clearly define the economic feasibility of the project, sensitivity to capital and operating cost, feedstock/ product pricing and start-up timing. The Customer normally carries out activities during this project phase; however, the Customer will occasionally request Colt to carry out some of the required tasks.

The Customer must identify all the critical project elements, risks, assessments, timing and economics associated with a business plan to develop an opportunity. Initially, focus is on the "why" a business opportunity should be pursued and not technical details that are better suited for the forthcoming Design Basis Memorandum.


Related Discussions:- Define conceptual engineering phase for project

Heat treatment of cast iron, Heat Treatment of Cast Iron: Castings in...

Heat Treatment of Cast Iron: Castings in iron are frequently heat treated for enhancing mechanical properties and microstructure. The treatments known to cast iron are explai

Hartnell Governor, How we could build the working model of hartnell governo...

How we could build the working model of hartnell governor?

Welding procedure specification (wps), WELDING PROCEDURE SPECIFICATION (WPS...

WELDING PROCEDURE SPECIFICATION (WPS)   The purpose of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) is to determine that weldment proposed

Direct and bending stress, a masonry pier 3m*4m supports vertical load of 6...

a masonry pier 3m*4m supports vertical load of 600kn at point (1.2,1),find stresses at corner of pier

Vacuum tube oscillator, i am try to make a vacuum tube oscillator for a lar...

i am try to make a vacuum tube oscillator for a larger project but i need help where to find the supplies for it where can i find them

Evaluate the heat input per day, The input-output curve of a 60 MW power st...

The input-output curve of a 60 MW power station is provided by : I = 10 6 [8 + 8L + 0.4L 2 ] Kcl/hour where I is the input in the Kcal/hour and L is the load in MW. (a) Ev

Determine the ratio of the inlet pipe diameter, Air flows steadily at the r...

Air flows steadily at the rate of 0.5 kg/s through an air compressor, entering at 7m/s velocity, 100 kPa pressure, and 0.95 m 3 /kg volume, and leaving at 5 m/s, 700 kPa, and 0.19

Dynamic Force Analysis, How to determine Forces and Torque of slider crank ...

How to determine Forces and Torque of slider crank mechanism?

What is injection moulding, Q. What is Injection moulding? An important...

Q. What is Injection moulding? An important industrial method of producing articles of thermoplastics is injection moulding. The moulding material is loaded into a hopper from

Performance criterion of a steam power plant, Performance criterion of a st...

Performance criterion of a steam power plant: Sol. :   The design of power plant can be determined largely by the consideration of capital cost and operating cost; the forme

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd