A worker machine operation was found to involve 3.5 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The workers time averaged 2.3 minutes per cycle and the worker was given a rating of 120 percent(machine rating is 100 percent). Mid way through the study, the worker too a 10 minute rest break. Assuming an allowance factor of 11 percent of work time, determine the standard time for this job course not round intermediate calculation. Round your final answer to 2 decimal places.

Related Discussions:- Design of work systems

Explain percentage must materials cost be reduced, Merk, Inc., produces ele...

Merk, Inc., produces electronics component on an assembly line. The standard cost for the component is $105 (labor $15, materials $60, and other costs $30). The sellings price is $

Explain how much would he receive under the incentive plan, Fulton Enterpri...

Fulton Enterprises is trying to determine standard production per day for an incentive program. Suppose that the incentive program will pay $1 per unit produced above standard rate

Explain the production plant capable of making per week, Kamal's Roti Facto...

Kamal's Roti Factory makes Rotis and delivers them to various restaurants and delis around Brooklyn. The production plant made 200,000 Rotis last week. The production plant operate

Outline one attribute or capacity of servant leadership, 1 Address the foll...

1 Address the following questions and concepts: 1) Describe one attribute or capacity of servant leadership and explain how and where you might apply this pri

Explain fledible cross functional teams, Strategy Highlits 11.2 dicusses th...

Strategy Highlits 11.2 dicusses the informal oranizational structure of W.L.Gore and Associates. Go to the firm's Website (www.gore.com) and review the scope of the firm. a. Wha

As a result of testing 20, As a result of testing 20,00 electric bulbs manu...

As a result of testing 20,00 electric bulbs manufactured by a company it was found that the lifetime of the bulbs was normally distributed with a mean of life of 2040 hours with st

Explain control process flow diagram, A typical change request from will in...

A typical change request from will include which of the following content item? a. a description of the change a long with the impact of marking the change. b. a status accounting

Line balacing, what happens if line balancing does not exist

what happens if line balancing does not exist

Calculate the regression equation, The I-10 carpet outlet wants to develop ...

The I-10 carpet outlet wants to develop a means to forecast its sales. The store manager believes that the stores sales are directly related to the number of new housing starts in

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd