Describe the slope - area method, Mechanical Engineering

Assignment Help:

Q. Describe the Slope - Area Method?

In the event of infeasibility of Velocity Area method on account of either rapid rise or fall of floods or lack of equipment or any other reason, the Slope-Area method is adopted for rough estimation of discharge.

The requirements of site are mostly similar to those in case of Velocity-Area method. In addition, the length of the reach in Slope-Area method is required to be reasonably stable, free from obstruction, straight and of uniform section for a length not less than 5 times the width of the channel and in any case not less than 300 m. The surface drop in this reach is also required to be not less than 150 mm. The gauges are read to 2 mm and the slope is worked out from the average of gauge observations at either end of the reach.


Related Discussions:- Describe the slope - area method

Assignment, history of electronics materials

history of electronics materials

Determine the permissible shear stress, A helical compression spring is use...

A helical compression spring is used to take the shock. The initial compression of the spring is 30 mm and it is further compressed by 50 mm while absorbing the shock. The spring i

Determine the displacement response time, (i) Formulate the equation of mot...

(i) Formulate the equation of motion for the system shown in Figure. List TWO (2) assumptions made in this formulation. (ii) Find the response of this system at t = 3s. The syst

Engineering mechanics, how to solve engineering mechanics statics problem?

how to solve engineering mechanics statics problem?

Water overflow in the sink, Water flows into the sink shown in figure 5 at ...

Water flows into the sink shown in figure 5 at a flow rate of 8 L/min. If the drain is closed, the water will eventually flow through the overflow drain holes rather than over the

Handling suspect material, Q. Handling Suspect Material? • Material or ...

Q. Handling Suspect Material? • Material or items at a Supplier's facility or those received or stored in the warehouse or other construction site location that require PMI-tes

Simple rules-priority rules-conventional priority rules, Simple Rules F...

Simple Rules FIFO (first in first out) PN j = t aj SPT (shortest processing time) PN j = o j ODD (earliest operation due dates) PN j = t dj EDD (earliest job due

Compton effect, Explain compton effect snd its significance

Explain compton effect snd its significance

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd