Depletion zone in p-n junction, Electrical Engineering

Assignment Help:

Depletion Zone in P-N Junction

The power of the depletion zone electric field gets increases as the reverse-bias voltage increases. One time the electric field intensity increases further than a critical level, the p-n junction depletion zone breaks-down and current starts to flow, generally by either Zener or avalanche breakdown processes. Both of these types of breakdown processes are non-destructive and are reversible, so long as the amount of current flowing does not reach levels which cause the semiconductor material to overheat and cause thermal damage.

This effect is employed to one's advantage in zener diode regulator circuits. Zener diodes have a specific - low - breakdown voltage. A standard value for breakdown voltage is for example 5.6V. The meaning of this is that the voltage at the cathode can never be more than 5.6V higher than the voltage at the anode, since the diode will break down - and therefore conduct - if the voltage gets any higher. This efficiently regulates the voltage over the diode.


Related Discussions:- Depletion zone in p-n junction

Energy band diagram, E n e r gy Band Diagram Energy band d...

E n e r gy Band Diagram Energy band diagram in qualitative form is sketched by following the following process: 1. The semiconductor device is supposed to be ma

Calculate the rated load current of machine, A 500 MVA, 33kv, three phase s...

A 500 MVA, 33kv, three phase steam turbine generator has a synchronous reactance of 1.6 p.u. It delivers a rated output at 0.8 power factor lagging. Calculate (a) The synchronou

What do you mean by noise, Q. What do you mean by Noise? In any communi...

Q. What do you mean by Noise? In any communication system there are usually two dominant factors that limit the performance of the system: 1. Additive noise, generated by el

Mov instruction, MOV Instruction Op code  format  of MOV  instruction i...

MOV Instruction Op code  format  of MOV  instruction is as follows : Replace the  codes of destination register and source  register with code of  required  register from.

Find the total line current flowing through feeder, Q. Athree-phase, 60-Hz ...

Q. Athree-phase, 60-Hz substation bus supplies two wye-connected loads that are connected in parallel through a three-phase feeder that has a per phase impedance of 0.5 + j2 . Loa

ADC and DAC design, I''m trying to design ADC using MAX1198 and DAC using I...

I''m trying to design ADC using MAX1198 and DAC using IDAC in Multisim 12 but none of them are working. I need some help in this regard

Gis applications in management of power distribution systems, GIS Applicati...

GIS Applications in Management of Power Distribution Systems: a.)        Inventory of existing network. b.)        Easy access to network details. c.)        Easy access

Resultant force, State and prove parallelogram law of forces and explain i...

State and prove parallelogram law of forces and explain it''s applications

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd