Algorithm for deletion of any element from the circular queue:

Step-1: If queue is empty then say "queue is empty" & quit; else continue

Step-2: Delete the "front" element

Step-3: If the "front" is pointing to last position of the queue then go to step-4 else go to step-5

Step-4: In the queue make the "front" point to the first position and quit

Step-5: Increment the "front" situation through one


Related Discussions:- Deletion of any element from the circular queue

Dqueue, how can i delete from deque while deletion is restricted from one e...

how can i delete from deque while deletion is restricted from one end

Graphs with negative edge costs, We have discussed that the above Dijkstra'...

We have discussed that the above Dijkstra's single source shortest-path algorithm works for graphs along with non-negative edges (like road networks). Given two scenarios can emerg

Union & intersection of two linklist, how to write an algorithm for unions ...

how to write an algorithm for unions & intersection of two linklists?

Define about the class invariant, Define about the class invariant A cl...

Define about the class invariant A class invariant may not be true during execution of a public operation though it should be true between executions of public operations. For

Program for all pairs shortest paths algorithm, Program segment for All pai...

Program segment for All pairs shortest paths algorithm AllPairsShortestPaths(int N, Matrix C, Matrix P, Matrix D) { int i, j, k if i = j then C[i][j] = 0  for ( i =

Draw a flowchart that takes temperatures input, Write an algorithm in form ...

Write an algorithm in form of a flowchart that takes temperatures input over a 100 day period (once per day) and outputs the number of days when temperature was below 20C and numbe

BST has two children, If a node in a BST has two children, then its inorder...

If a node in a BST has two children, then its inorder predecessor has No right child

Develop a material requirements plan, The below figure illustrates the BOM ...

The below figure illustrates the BOM (Bill of Materials) for product A. The MPS (Material requirements Planning) start row in the master production schedule for product A calls for

Darw a flowchart to inputs top speeds of 5000 cars, Write an algorithm in t...

Write an algorithm in the form of a flowchart that: inputs top speeds (in km/hr.) of 5000 cars Outputs fastest speed and the slowest speed Outputs average (mean) s

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd