Define the pre-tensioned concrete construction, Civil Engineering

Assignment Help:

Define the pre-tensioned concrete construction

We understand that in the pre-tensioned concrete construction, stretched tendons are provided in the concrete moulds at the time of  casting of concrete. In the post-tensioned concrete construction, this is not a requirement as the ducts are fitted inside the moulds at the time of casting of  concrete. The transfer of prestress takes place early in  the case of pre-tensioned concrete members (it
takes place at the time of cutting of  tendons after the concrete has sufficiently hardened) while the transfer of prestress, in the case of post-tensioned concrete members, takes place when tendons are placed  inside ducts and anchored in a stretched condition.


Related Discussions:- Define the pre-tensioned concrete construction

What is the role of sunfilter in building, QUESTION (a) Using an illu...

QUESTION (a) Using an illustration, describe what happens to sunrays when it passes through the atmosphere to reach the ground. (b) What is the role of a sunscreen/sunfil

Brigdes, infomation about differnt brigdes

infomation about differnt brigdes

Bituminous macadam, What is the working capacity of a road paver per hour f...

What is the working capacity of a road paver per hour for bituminous macadam

Strength of rivet joints, Ask question #Minimum 100 Please help me to...

Ask question #Minimum 100 Please help me to write a c program to determine strength and efficiency of single cover butt joint, lap joint, double cover butt joint . words ac

Explain about differential settlement, Q. Explain about Differential settle...

Q. Explain about Differential settlement? Structural stability is not very much affected by uniform settlement of a structural system. Major amount of damages will be taking pl

Explain chezy manning equation, Explain Chezy Manning Equation v = 1.49...

Explain Chezy Manning Equation v = 1.49/n (R) 0.67 (S) 0.5     R = hydraulic radius (ft) = Area/ wetted perimeter, R = D/4 for circular channels full and one-half full

Preloading - control of settlements, Q. Preloading - Control of settlements...

Q. Preloading - Control of settlements? This method consists of loading the soil strata by a load intensity which will be equal to or higher than the expected load intensity. T

Amount of water that added to achieve the optimum moisture, Geotechnical pr...

Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction.   The field moisture test finds that fi

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd